4. Installation Procedures
30
Green21 (Model: PCT-90LH) Installation Manual
4.3
Installing the Handle Frame and Chair
4.3.1 Installing the Handle Frame
Handle frame knob locking is released so that the damage will
be reduced, even if there is an impact outside the packing box.
1. Put the Handle Frame into the Base Unit and tighten two bolts on the front side as
shown in the following figures.
Wrench Bolt
Part No.: 26
w/spring
Size: M10 x 30
Qty.: 2 ea
Figure 4-15. Tightening two bolts on the front side
Summary of Contents for Green 21 PCT-90LH
Page 1: ...User Manual Model PCT 90LH Version 1 49 Full version English...
Page 2: ......
Page 127: ......
Page 128: ......