4. Installing the Equipment: Base Stand (Optional)
48
Green 16/18 Installation Manual
4.2
Installing the CEPH Unit (Optional)
Never hold the areas of the collimator, sensor, and tube
head.
1. Now it is assumed that the CEPH box has already been opened.
2. Remove the plastic wrap covering the column unit and the tape for fixing the
CEPH cables by using a cutter.
3. Move and mount the CEPH unit on the Main Unit carefully while observing the
insertion state of 4 studs.
Summary of Contents for Green 16
Page 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Page 2: ......
Page 8: ......
Page 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Page 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Page 160: ......
Page 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...