2. Choosing an Installation Site
12
Green 16/18 Installation Manual
2. Choosing an Installation Site
2.1
Room Requirements
The location of this equipment should allow for high
visibility of the patient by the operator, and the operator
should be as about the patient as possible.
This equipment should not be installed on thick carpets
for stability reasons.
Anti-static floor materials should be used around the
equipment.
The PC monitor, emergency cut-off switch, and X-ray
Exposure Switch
should be installed in the vicinity of
the operator so that he or she can manage them
simultaneously in case of emergency.
<Without CEPH Unit (optional): 2,055 mm (L) x 2,495.8 mm (W) or wider >
Summary of Contents for Green 16
Page 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Page 2: ......
Page 8: ......
Page 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Page 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Page 160: ......
Page 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...