3. Installing the Equipment
48
EzRay Air Wall (Model: VEX-S300W) Installation Manual
1.
Arrange the cables and cover the horizontal arm opening with the HORIZONTAL
LOWER COVER (Part No.2).
HORIZONTAL ARM
CABLE COVER
Material: ABS
(White)
Part No.: 2
Qty.: 1 ea
3.6.4
Cabling between the Scissor Arm and the X-ray Generator
1. White connector (3-pin)
↔
White connector (3-pin)
2. Black connector (8-pin)
↔
Black connector (8-pin)
3. Protective Earth (PE) Cable from the Scissor Arm
When you connect the
Protective Earth (PE) Cables
to the
PE conductor
by using the Truss Screw
(Part No.5)
with
Star Washer
(Part No.6)
, please refer to the illustration
below.
1
2
3
Summary of Contents for EzRay Air Wall VEX-S300W
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 64: ...3 Installing the Equipment 54 EzRay Air Wall Model VEX S300W Installation Manual ...
Page 66: ...4 Product Specifications 56 EzRay Air Wall Model VEX S300W Installation Manual ...
Page 67: ...4 Product Specifications EzRay Air Wall Model VEX S300W Installation Manual 57 ENGLISH ...
Page 74: ...Appendix 64 EzRay Air Wall Model VEX S300W Installation Manual Double Stud ...
Page 79: ......
Page 80: ...Copyright VATECH Networks All Rights Reserved ...