Figure 22:
On/Off
button
The initialisation process can be tracked at the LED ring of the
On/Off
button (see also Table 7):
Flashes green every second: System check (duration:
approx. 90 s).
Steady green light: The storage system is ready
(duration: approx. 60 s).
Steady red light: Probable error = the battery modules
have not yet been configured.
Continue with commissioning.
Note:
If the LED ring fails to respond, check the following:
On/Off
button correctly latched?
Fuses connected?
Grid connection correct?
Door contact switch not damaged?