Subject to alteration! Updated 11/2015
47
G
ener
al
O
p
er
atio
n
Inst
all
atio
n
O
p
er
atio
n
(
S
e
rvi
ce
)
Ma
int
enan
c
e
To minimise losses, the cable run between
storage system and connection must not exceed
20 m.
8.3.2
Preparation of the AC port for the building grid
To connect to the building grid, the 5-wire AC cable must be
attached to the supplied AC connector.
Strip the cable 4 cm at the end.
A flexible plastic-sheathed cable facilitates
assembly work.
The PE conductor must be 0.5 cm longer than the other
four conductors (L1, L2, L3, N). Shorten these conductors
accordingly.
Strip the wires for the building connection approx. 8 mm
at the ends.
Ferrules must be used for fine-stranded conductors.
Open the socket: Do this by loosening the union nuts of
the strain relief and detaching the strain relief from the
socket part. Release the catch by pressing on the two
side lugs at the same time.