background image

Installation, operation and care

EP E Series

7-stage electric boilers

EP 26E

and

EP 42E

2011-03-21
utg:

 

xxxxxx

Ersätter:08-05

Summary of Contents for EP E Series

Page 1: ...Installation operation and care EP E Series 7 stage electric boilers EP 26E and EP 42E 2011 03 21 utg xxxxxx Ers tter 08 05...

Page 2: ...tures 4 Technical data 5 HVAC installation 6 Siting the boiler Cables and pipework Safety supply pipe Waterquality Frostprotection Flow requirement HVAC installation 7 Pressure drop diagram Direction...

Page 3: ...s are shown in bold Numberofpower stages 7 6 5 4 1 2 ON ON OFF OFF ON OFF ON OFF Cirkulationpump 3 OFF ON eco summer mode continuous operation Main fuse EP42 EP26 1 3 125A 100A 80A 63A 50A 35A ON ON O...

Page 4: ...onnected power according to the current heating requirement The power can be limited to four power stages For safety the boiler can handle zero flow in other words it does not need to be fitted with a...

Page 5: ...thread 34 Drain valve R15 35 Opening cover for electrical connections 36 Cable bushing 37 Adjustable base bolts EP 26 E EP 42 E Power 26 25 42 kW Current 37 9 61 A Power stage 3 75 6 kW Current stage...

Page 6: ...e the system watertight so that no new oxygen rich water has to be added and to ensure that the water is not oxygenated during installation In large systems it is virtually impossible to prevent leaks...

Page 7: ...ted statistical pressure on the suction side Closed expansion system 2 5 bar 100 kW and 110 C The safety and venting valves are mounted on the boiler safety pipe 2 5 bar 100 kW and 110 C The safety va...

Page 8: ...tallation Electrical installation must be in accordance with the applicable regulations under the supervision of an authorised installer The boiler and water heater must be filled with water before el...

Page 9: ...wer The temperature control within the boiler itself takes precedence so the boiler temperature setting should be slightly higher than neces sary for the system The boiler Power status light will flas...

Page 10: ...g 8 PCB 9 Indicator for power group one 10 Indicator for power group two 11 Indicator for power group three Wiring diagram EP 26 E 12 Alarm overheat protection triggered 13 Alarm relay 14 Control swit...

Page 11: ...eat protection triggered 1 2 3 4 1 2 3 4 1 2 1 2 3 4 1 2 3 2 3 4 5 6 9 7 8 11 10 12 13 14 15 16 17 18 19 20 21 1 22 23 40 13 Alarm relay 14 Control switch 15 Control fuse 16 Overheat protection power...

Page 12: ...f the power can be connected immediately after a loss of power lasting longer than three minutes The remaining power is delayed by an hour To test the boiler after it has been without power for exampl...

Page 13: ...ondition Ask the installer to demonstrate the settings and functions so you know exactly how to operate and care for the system Check the water pressure air may remain in the system for a while after...

Page 14: ...mited Check the setting see page 8 Number of power stages The boilers is being controlled by a 0 10 V signal The boiler temperature setting is too low Outdoor temperature compensa tion is connected th...

Page 15: ...ock 3 pole 1 1 16 00 06 End plate 1 1 16 00 09 Jumper 2 pole 6mm 1 1 16 00 11 Jumper 4 pole 6mm 1 1 16 00 12 End support 2 2 16 00 13 Bar bracket 1 1 40 16 00 18 Neutral terminal NPF 35 1 6 6 40 16 00...

Page 16: ...4644 226358 291 94 Kristianstad www varmebaronen se Sweden info varmebaronen se V rmebaronen AB retains the right to change the specification of included components without prior notice as part of it...

Reviews: