Varec, Inc.
29
Figure 8:
Conduit Connection and Tank Side Support Bracket Details
Installing a Roof Reading Gauge Head
Note
Ensure you have completed all previous steps from your installation checklist
before proceeding.
Warning
When removing the gauge head back cover, stand to one side as the last bolt is
removed. If the negator motor spring is broken, the broken pieces may cause injury when
the cover is removed.
1. Remove the back cover and gasket from the gauge head.
2. Apply pipe thread compound and attach the gauge head to the exterior vertical pipe.
Position it for convenient reading.
1
1-1/2 Inch NPT union and
close nipple, furnished by customer
5
Bolted
Tank Wall
Welded
Tank Wall
Summary of Contents for 2500
Page 2: ......
Page 6: ...vi Installation and Operations Manual...
Page 10: ...2500 Automatic Tank Gauge 10 Installation and Operation Manual...
Page 16: ...2500 Automatic Tank Gauge 6 Installation and Operations Manual...
Page 66: ...2500 Automatic Tank Gauge 56 Installation and Operations Manual...
Page 68: ...2500 Automatic Tank Gauge 58 Installation and Operations Manual...
Page 108: ...2500 Automatic Tank Gauge 98 Installation and Operations Manual...
Page 112: ...2500 Automatic Tank Gauge 102 Installation and Operations Manual...
Page 118: ...2500 Automatic Tank Gauge 108 Installation and Operations Manual...
Page 123: ......