Vanderbilt ACT365-ACU Installation Instructions Manual Download Page 6

ACT365-ACU2A

V54502-C131-A100

Single door cloud IP controller with 2A 12V DC PSU

ACT365-ACUPoE 

V54502-C132-A100

Single door cloud IP controller with PoE PSU

1.3 Monitoring

All faults including Mains Present and Tamper are reported on the ACT365 portal.

Mains present

For  the ACT365-ACU, the PSU MAINS PRESENT output is pre-wired to the AC MON 
input.

Output Voltage

For the ACT365-ACU, the PSU output voltage level is reported to the ACT365 portal.

Tamper / Break 
Glass

All faults, including tamper and break glass, are reported to the ACT365 portal.

ACT365-ACU / ACT365-ACU2A / ACT365-ACUPoE – Installation Instructions

Overview

© Vanderbilt 2019

6

A-100521-c

15.03.2019

Summary of Contents for ACT365-ACU

Page 1: ...ACT365 ACU ACT365 ACU2A ACT365 ACUPoE Installation Instructions Document ID A 100521 c Edition date 15 03 2019 ...

Page 2: ...lares that this equipment type is in compliance with the following EU Directives for CE marking Directive 2014 30 EU Electromagnetic Compatibility Directive Directive 2011 65 EU Restriction of the use of certain hazardous substances Directive The full text of the EU declaration of conformity is available at http van fyi Link DoC ACT365 ACU2A Hereby Vanderbilt International IRL Ltd declares that th...

Page 3: ... 3 Troubleshooting 10 2 3 4 Tamper 10 3 Wiring 11 3 1 Typical wiring of ACT365 ACU 11 3 1 1 Wiring exit readers 12 3 2 Fire override configuration 12 3 3 Interlock airlock configuration 12 3 4 Intruder panel wiring 13 4 Defaulting the Controller and IP Address Configuration 15 4 1 Factory default the Controller DIP switch 2 15 4 2 DHCP static IP addressing DIP switch 1 15 4 3 Defaulting the static...

Page 4: ...ons H x W x D mm 165 x 235 x 55 275 x 330 x 80 275 x 330 x 80 Controller Weight kg 0 4 2 2 2 2 Operating Temperature 10 to 50 C 10 to 40 C 75 RH non condensing 10 to 40 C 75 RH non condensing Operating Environment Surface mounting Internal use only Surface mounting Internal use only Surface mounting Internal use only Enclosure Material ABS 1 2mm steel grey powder coated 1 2mm steel grey powder coa...

Page 5: ... DC Nominal on mains power 10 0 12 3V DC on battery standby N A Output Max load current N A 2 0A N A Output Ripple N A 150mA pk pk max N A Output Load output fuse N A F2 0A N A Output Overload N A Electronic shutdown until overload or short circuit removed Under mains power only N A 1 1 2 Relay load When used with inductive loads Maglock Strike locks the following ratings apply ACT365 ACU ACT365 A...

Page 6: ...orted on the ACT365 portal Mains present For the ACT365 ACU the PSU MAINS PRESENT output is pre wired to the AC MON input Output Voltage For the ACT365 ACU the PSU output voltage level is reported to the ACT365 portal Tamper Break Glass All faults including tamper and break glass are reported to the ACT365 portal ACT365 ACU ACT365 ACU2A ACT365 ACUPoE Installation Instructions Overview Vanderbilt 2...

Page 7: ...EMC 2 1 ACT365 ACU 2 1 1 Mounting Mount the ACT365 Controller directly on to the wall with the supplied screws The keyed mounting hole should be screwed first to the wall to aid the mounting The unit should be installed in a ventilated area that allows for accessibility after installation 2 1 2 Power supply The ACT365 ACU requires an external 12V DC or 24V DC power supply The supply should be conn...

Page 8: ...heck green Mains LED is on Note Red LED may be illuminated dependent upon model to indicate that no battery has been connected This is normal 3 Verify load is operating correctly 4 Disconnect mains power 2 2 4 Standby Battery Note Ensure batteries being fitted to this unit are in good condition 1 Connect battery leads to battery ensuring correct polarity of battery connections Vanderbilt recommend...

Page 9: ... Mounting 1 Mount the boxed module securely using the enclosure mounting points in the correct orientation allowing 100mm clearance around the enclosure see diagram 2 Route cables via knockouts and or rear cable enclosure entry holes 2 3 2 Power Up 1 Attach correctly rated load cable to load equipment and fasten using cable ties Note polarity 2 Attach suitable Ethernet cable from PoE source to POE...

Page 10: ... connection of a deeply discharged battery The fault should be rectified before restoring power to the ACT365 ACUPoE If any of the fuses require replacing ensure the correct fuse rating and type is used A spare fuse is supplied with the controller Battery charging will only start after a compliant PoE power source is connected to ACT365 ACUPoE it will not start up on battery Ensure only a healthy ...

Page 11: ...13 3 1 Typical wiring of ACT365 ACU Label Description Label Description A Door contact normally closed E Ethernet RJ45 Note All IP device must have a valid IP Address B Push to exit normally open F Important Place varistor across all lock terminals Note Diagram shows normally energised Magnetic Lock C Break glass monitoring normally closed G Break glass unit double pole Vanderbilt 2019 11 A 100521...

Page 12: ...the door group containing fire doors from the Fire Door Group drop down list then click Save 3 Wire the fire alarm panel A to the controller as shown While the 0V signal is maintained at the AUX input on Door 1 the doors in the Fire Doors group maintain normal operation When the 0V signal is removed the doors in the Fire Doors group are unlocked The fire doors remain unlocked until the 0V signal i...

Page 13: ...X Relay time to zero C Connect a signal from the alarm panel to indicate armed or disarmed status If 0V is connected to AUX Input the panel is armed 2 Wire the door from which the system will be armed disarmed 3 On the ACT365 customer portal select the site from the site picker 4 On the ACT365 customer portal program the ACT365 ACU a Click Access Control Doors Door Name b Under Aux Relay select th...

Page 14: ...ultiple doors should lock when the intruder panel is armed then each door must monitor the alarm status If the intruder panel is not being monitored then only the door that is wired to control the intruder panel will lock ACT365 ACU ACT365 ACU2A ACT365 ACUPoE Installation Instructions Wiring Vanderbilt 2019 14 A 100521 c 15 03 2019 ...

Page 15: ...DIP switch 2 to ON 3 Hold down the Tamper spring 4 Apply power to the ACT365 ACU Controllers 5 Wait approximately 5 seconds until the controller confirms default completed by sounding the buzzer 6 Release the Tamper 7 Power down the ACT365 ACU Controller 8 Set the DEFAULT DIP switch to OFF 9 Re apply power 4 2 DHCP static IP addressing DIP switch 1 The ACT365 ACU Controller is shipped with the DHC...

Page 16: ...ULT DIP switch 2 to OFF 8 Re apply power Note The static IP address can be changed via the web interface 4 4 Changing static IP address on the ACT365 ACU 1 Connect the ACT365 ACU Controller to the IP network 2 Open a web browser on a PC for example Microsoft Internet Explorer Google Chrome etc 3 Enter http NetBIOS address e g http ACT365ACU010049 4 Logon details Username installer Password 999999 ...

Page 17: ...U Controllers provide a method to monitor an Emergency break glass switch via the BG EDR input The fault LED will illuminate if the Emergency break glass switch is activated l Mains Fault ACT365 ACU will accept a mains present signal from a PSU This is wired into AC MON input on the PCB When the PSU has no mains supply the fault is active l Low Supply Voltage When voltage to the 12 24V terminal is...

Page 18: ...erbilt International Ltd Clonshaugh Business and Technology Park Clonshaugh Dublin D17 KV 84 Ireland vanderbiltindustries com contact Vanderbilt 2019 Data and design subject to change without notice Supply subject to availability Document ID A 100521 c Edition date 15 03 2019 ...