SECTION 3: INSTALLATION
090189-OP_r0 (JUNE-2022)
3 - 7
VANAIR MANUFACTURING, INC.
(844) VAN-SERV • www.vanair.com
Cap•Start Hydraulic-Driven
12V/24V • Battery Starter • Charger
sibility of pressure/
fl
ow drops that may occur if
other hydraulically-powered equipment is activat-
ed during
Cap•Start
operation, which may in turn,
cause the
Cap•Start
to stall out. Alternatively, use
of a diverter valve will permit hydraulics to power
di
ff
erent equipment selectively.
3.5.7 ROUTING
Refer to
Figure 3-1
or
Figure 3-2
, and the wiring
diagrams (
Sections 7.17
and
7.18
) . Ensure that
all supply hoses and electrical wiring are correct-
ly speci
fi
ed, adequately supported, and do not
touch or rest on any sharp edges. Wiring should
be protected with split loom to prevent corrosion,
and consequently, loss due to down time.
3.5.8 HYDRAULIC SYSTEM
REQUIREMENTS
Refer to
Sections 7.19
through
7.22
for hydraulic
system schematic layouts and components. The
following requirements should be taken into con-
sideration before installing the hydraulic system: .
• The duty cycle and ambient operating tempera-
tures.
• Other hydraulic equipment which may share
the same hydraulic supply system (Vanair
recommends a dedicated pump and hydraulic
circuit).
3.6
CONNECTING THE HYDRAU-
LIC SUPPLY AND RETURN
Refer to
Figure 3-1
or
Figure 3-2
for hydraulic
supply and return hose location connections and
layout routing. Use correctly rated hoses (3000
PSI minimum) to securely connect both supply
(¾” JIC 37° male) and return connectors (1” JIC
37° male).
NOTE
Vanair recommends:
• SUPPLY HOSE: 3/4” JIC, 3000 PSI
• RETURN HOSE: 1” JIC, 500 PSI
• CASE DRAIN: 3/8” JIC, 500 PSI (load sense
1/4" JIC 3000 PSI; closed-center only)