SECTION 4: INSTALLATION
AIR N ARC
®
300 SERIES ALL-IN-ONE POWER SYSTEM
®
PAGE - 44
090034-OP_r0
KEY
DESCRIPTION
A
MOUNTING HOLE LOCATIONS
Figure 4-5: Drill Point Locations
A
2. Refer to
Figure 4-5
. Using a scribing tool or
pen, place a mark through all of both
mounting holes [
A
] on the service body’s
mounting surface. There will be a
minimum
of four (4) holes that will need to be indicated
(two to three for each bracket).
3. Ensure that all proper machine clearances will
be maintained. Then temporarily move the
machine so that the service body floor can
be drilled. Drill four (4) 9/16” mounting holes
in the service body floor at the scribed
markings made in step #4.
4.5.3 STABILIZING PRECAUTIONS FOR MACHINE
MOUNTING
Refer to
Figure 4-6
. Machine should be mounted to
vehicle using a minimum of four (4) isolators. Isolators
NOTE
Do not bolt and torque machine into
place until all preparation tasks as
described in
Sections 4.4
through
4.12
have been achieved.
IMPORTANT
Vehicle mounting surface must be level,
and may need to be augmented for
support and/or stability, if necessary.