Valor Legend G3 Series Installation Instructions Manual Download Page 1

4002602-02

L

EGEND

 G3

© 2011, Miles Industries Ltd. All rights reserved.

Natural Gas Conversion Kit

738NGK

Installation Instructions

Use with with 

Valor Models 738XB Heater ONLY

WARNING

This conversion kit shall be installed by a 
qualifi ed service agency in accordance with 
the manufacturer’s instructions and all appli-
cable codes and requirements of the authority 
having jurisdiction. If the information in these 
instructions is not followed exactly, a fi re, ex-
plosion or production of carbon monoxide may 
result causing property damage, personal in-
jury or loss of life. The qualifi ed service agency 
is responsible for the proper installation of this 
kit. The installation is not proper and complete 
until the operation of the converted appliance 
is checked as specifi ed in the manufacturer’s 
instructions supplied with the kit.

Use this manual in conjunction with the instal-
lation manual supplied with the appliance.

General notes regarding conversion

The conversion may be done before or after the 
appliance is installed into the cavity. However, the 
gas must be connected in order to set the manifold 
pressure.

Once converted to NG, this appliance is certifi ed for 
use from 0–4500 feet. For altitudes above 4500 feet, 
see local codes.

Kit Contents

1 Pilot injector (marked 35)
1 Burner
1 Injector (marked 650)
1 Set of conversion labels
1 Set of air shutters

Tools Required

• 

Wrenches, to disconnect gas line

• 

Phillips (+) screwdriver, to remove burner module & 
pilot shield

• 

Small (jewelers size) fl at blade screwdriver, to set 
pressure

• 

Small fl at blade screwdriver, to release pressure tap 
on valve

• 

Needle nose pliers, to remove by-pass screw

• 

Hex (Allen) wrench, 4 mm or 5/32”, to remove pilot 
injector

• 

Manometer, to set manifold at the valve

Rating

Maximum 24,000 Btu/hr
Minimum 6,500 Btu/hr

Summary of Contents for Legend G3 Series

Page 1: ...cturer s instructions supplied with the kit Use this manual in conjunction with the instal lation manual supplied with the appliance General notes regarding conversion The conversion may be done before or after the appliance is installed into the cavity However the gas must be connected in order to set the manifold pressure Once converted to NG this appliance is certified for use from 0 4500 feet ...

Page 2: ...emove the 2 screws securing the burner brackets to the burner tray 7 Detach the two burner support brackets from the burner by removing two nuts using a 5 16 8 mm wrench 8 Accessing pilot assembly from underside of module disconnect the pilot pipe using a 7 16 11 mm wrench 9 Remove the pilot injector Replace with natural gas injector 10 Replace main burner with natural gas burner assembly supplied...

Page 3: ...tapping Fit a manometer to the manifold pressure test tapping 16 Light the appliance and turn up to full fire Check for leaks downstream of the valve Adjust the manifold pressure setting screw to 3 95 w c 17 Turn appliance off Remove the manometer and tighten the test tapping screw Refit the valve cover 18 Fit the data conversion label and signed conversion label close to the rating plate Fit the ...

Page 4: ...our enlever l injecteur de la veilleuse Manomètre pour régler la pression d admission Indices Maximum 24 000 Btu hre Minimum 6 500 Btu hre AVERTISSEMENT Ce kit de conversion doit être installé par une agence de service qualifiée selon les directives du fabricant et tous les codes et règlements applicables dans la juridiction de l installation Dans les cas ou les directives de ce guide ne se raient...

Page 5: ...vis retenant les supports du brûleur à la plaque 7 Détachez les 2 supports de brûleur du brûleur en enlevant 2 boulons à l aide d une clé de 5 16 8 mm 8 Accédez à l assemblage de la veilleuse par en dessous de la plaque et débranchez le conduit de la veilleuse à l aide d une clé de 7 16 11 mm 9 Enlevez l injecteur de veilleuse Remplacez le par l injecteur pour le gaz naturel 10 Remplacez le brûleu...

Page 6: ... d admission 16 Allumez l appareil et tournez le bouton de contrôle sur la soupape pour obtenir l apport maximal Vérifiez s il y a des fuites en aval de la soupape Réglez la vis de réglage de pression à 3 95 po c e 17 Éteignez l appareil Enlevez le manomètre et serrez la vis de vérification de pression Replacez le capuchon sur la vis de réglage de pression 18 Fixez l étiquette de conversion avec n...

Reviews: