68
Troubleshooting
ICON10 / ICON1
View Prescription
To display the duty cycle for each sprinkler in a spe-
cific Managed Zone, follow these steps:
1. Push
Menu
,
Programs
,
VRI
,
and
VRI-iS
for the
VRI-iS screen. See Figure 68-1.
NOTE
• The displayed Cycle Time is calculated
using a % Timer value of 100%.
To choose the Managed Zone:
• Push the
Next
or
Previous
button to increase
or decrease the viewed Management Zone by 1.
or
• Select the
Managed Zone
field and enter the
zone using the numeric keypad.
1
2
3
4
5
6
7
Figure 68-1 1. Menu
2. Programs
3. VRI
4. VRI-iS
5. Next
6. Previous
7. Managed Zone Field
Summary of Contents for VRI-iS
Page 2: ...2 This page was left blank intentionally...
Page 44: ...This page was left blank intentionally 44 Setup...
Page 50: ...50 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Field Install pn 9312421...
Page 51: ...51 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Wiring Schematic pn 0999334...
Page 52: ...52 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Field Install pn 9312419...
Page 53: ...53 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Wiring Schematic pn 0999346...
Page 82: ...82 Troubleshooting This page was left blank intentionally...
Page 102: ...102 Parts This page was left blank intentionally...