© 2018 Valeport Ltd
Installation
Page 13
3.3. Deployment Of The Water Sampler System
3.3.1. Assembly
The water sampler system is supplied in kit form, and must be assembled prior to use. The procedure
should take no more than 30 minutes. All required tools are provided.
Unpack the frame from the packing case, and remove all the packaging materials. The following
components should be present, as illustrated:
12x
40cm stainless steel rods
12x
20cm stainless steel rods
12x
M5 stainless steel screws
1x
stainless steel bottle mounting ring
1x
combined top & bottom frame
2x
150mm diameter clamping rings for MIDAS CTD+
2x
310mm diameter clamping rings for EcoLab (1 packed separate, 1 fixed to bottom frame)
1x
motor assembly (not illustrated)
Begin by separating the top and bottom frames, by
undoing the wing nuts holding them together: