Valco Cincinnati
D-1
Appendix D—Maintenance Procedures
Introduction
This appendix contains recommended daily, weekly, 3-month, 6-month, and 12-month maintenance procedures for
the VC350A system.
The maintenance procedures contained in this appendix are to be used for
cold-glue systems only. OTHERWISE, DAMAGE TO EQUIPMENT COULD
OCCUR.
Action
Date
Shift
Initials
1.
Clean the exterior portion of the glue valves, nozzle
tips, glue heads, etc.
2.
Purge the glue valves if necessary, and ensure proper
glue flow.
3.
Ensure that air and glue pressure settings are correct.
4.
If using glue insp ection:
Ensure that sensor is clean. (Lens must be clean
and clear with no scratches.)
Check sensor for proper height adjustment.
Adjust for proper sensitivity if necessary.
Daily Maintenance
Summary of Contents for VC350A
Page 1: ...VC350A Flexoseal System Manual Number MC037 Release Date May 2001 ...
Page 8: ...Section 1 Introduction VC350A Flexoseal System Valco Cincinnati 1 2 Figure 1 1 VC350A Control ...
Page 68: ...Section 9 Maintenance VC350A Flexoseal System Valco Cincinnati 9 9 Figure 9 4 Fluid Regulator ...
Page 133: ...Section 12 Part Number List VC350A Flexoseal System Valco Cincinnati 12 44 400EZ Glue Valve ...
Page 163: ...Section 12 Part Number List VC350A Flexoseal System Valco Cincinnati 12 74 Fittings ...