Test Equipment
KVM connected
Test Procedure
1. Enter the TTY setups through
dspx
.
2. Issue the
Mz
command.
Checklist
Table 99 Transmitter Phase Control Setup Checklist
Task
Checked OK/Not OK
Remarks
Test procedure completed successfully.
Parameters are set.
See
5.2.7 Mz — Transmissions and Modulations (page 126)
Test Passed
For Customer
Date:
For Vaisala
Date:
A.15 Ascope Test
Test Goal
Verify that the
Ascope
utility functions properly.
Background
The
Ascope
utility provides independent radar control and plotting for testing the radar and
RVP900.
Test Equipment
KVM connected
Test Procedure
1. Enter the TTY setups through
dspx
.
2. Issue the
ascope
command.
3. Verify that the
Ascope
utility launches and that the data display begins updating.
4. Configure a
DEFAULT
startup and save it.
5. Exit and restart
Ascope
.
6. Verify that the default startup is properly restored.
Appendix A – Installation and Test Procedures
353
Summary of Contents for RVP900
Page 1: ...M211322EN J User Guide RVP900 Digital Receiver and Signal Processor RVP900...
Page 22: ...RVP900 User Guide M211322EN J 20...
Page 88: ...RVP900 User Guide M211322EN J 86...
Page 170: ...RVP900 User Guide M211322EN J 168...
Page 236: ...RVP900 User Guide M211322EN J 234...
Page 390: ...RVP900 User Guide M211322EN J 388...
Page 434: ...Figure 68 ASR9 WSP with RVP7 Architecture RVP900 User Guide M211322EN J 432...
Page 456: ...Figure 82 J90 to J111 Wiring Diagrams RVP900 User Guide M211322EN J 454...
Page 457: ...Figure 83 J13 Wiring Diagram Appendix H TDWR Customizations 455...
Page 468: ...RVP900 User Guide M211322EN J 466...
Page 482: ...RVP900 User Guide M211322EN J 480...
Page 483: ......
Page 484: ...www vaisala com...