Background
RVP900 supports several test features that are configured in this section.
Vaisala recommends that the LEDs be set to
1:Go/Proc
so that the front panel red LED
flashes during each processing cycle.
For operational systems, turn off the simulation feature.
Test Equipment
KVM connected
Test Procedure
1. Enter the TTY setups through
dspx
.
2. Issue the
M+
.
3. Set all the values, as required.
Checklist
Table 98 Debug Options Checklist
Task
Checked OK/Not OK
Remarks
Test procedure completed successfully.
Parameters are set.
See
5.2.8 M+ Debug Options (page 127)
.
Parameters have been set.
Test Passed
For Customer
Date:
For Vaisala
Date:
A.14 Checking Transmitter Phase Control
with Setup
Mz
Command
Test Goal
Verify that the TTY setups for the Transmitter Phase Control section are properly configured
for the customer application.
This feature is not used for magnetron systems since these have inherent random phase
that is measured, but not controlled.
RVP900 User Guide
M211322EN-J
352
Summary of Contents for RVP900
Page 1: ...M211322EN J User Guide RVP900 Digital Receiver and Signal Processor RVP900...
Page 22: ...RVP900 User Guide M211322EN J 20...
Page 88: ...RVP900 User Guide M211322EN J 86...
Page 170: ...RVP900 User Guide M211322EN J 168...
Page 236: ...RVP900 User Guide M211322EN J 234...
Page 390: ...RVP900 User Guide M211322EN J 388...
Page 434: ...Figure 68 ASR9 WSP with RVP7 Architecture RVP900 User Guide M211322EN J 432...
Page 456: ...Figure 82 J90 to J111 Wiring Diagrams RVP900 User Guide M211322EN J 454...
Page 457: ...Figure 83 J13 Wiring Diagram Appendix H TDWR Customizations 455...
Page 468: ...RVP900 User Guide M211322EN J 466...
Page 482: ...RVP900 User Guide M211322EN J 480...
Page 483: ......
Page 484: ...www vaisala com...