background image

10

Operating and installation instructions 0020244064_02

5.1.2.2 Case no. 2

1

1

2

3

3

3

3

2

1

Heat pump

2

Heating circuit

3

Plug

5.1.2.3 Case no. 3

1

3

3

3

3

3

1

2

3

2

1

Heat pump

2

Heating circuit

3

Plug

5.1.2.4 Case no. 4

4

1

3

2

2

1

3

4

4

4

1

Heat pump

2

Boiler

3

Heating circuit

4

Plug

5.2

Carrying out the wiring

Note

The temperature sensor is not enclosed but must
be ordered separately.

1

2

3

1.

Screw the sensor pocket

(1)

into the cylinder.

2.

Screw the stuffing box

(2)

into the sensor pocket

(1)

.

3.

Use heat-sink paste to insert the temperature sensor

(3)

into the sensor pocket

(1)

.

Validity:

VPS R 200/1 B

To guarantee the leak-tightness of the cylinder, always
install the two sensor pockets, even if only one tem-
perature sensor is used.

Summary of Contents for VPS R 100/1 M

Page 1: ...en Operating and installation instructions en Country specifics Buffer cylinder VPS R 100 1 M VPS R 200 1 B 0020244064_02 07 09 2023 TRANSLATION...

Page 2: ...2 en Operating and installation instructions 3 en Country specifics 14...

Page 3: ...4 1 Unpacking 6 4 2 Checking the scope of delivery 7 4 3 Dimensions of the product and the connections 7 4 4 Minimum clearances 7 4 5 Clearance from combustible components 7 4 6 Observing the requirem...

Page 4: ...eyond that specified in this document shall be considered improper use Any direct commercial or industrial use is also deemed to be improper Caution Improper use of any kind is prohibited 1 3 General...

Page 5: ...1 3 8 Risk of injury and material damage due to maintenance and repairs carried out incorrectly or not carried out at all Never attempt to carry out maintenance work or repairs on your product yoursel...

Page 6: ...y on the 200 litre model A G1 1 2 hydraulic con nection B G1 1 2 hydraulic con nection C G1 1 2 hydraulic con nection D G1 1 2 hydraulic con nection 3 2 Information on the identification plate The ide...

Page 7: ...pocket 2 Stuffing box 6 G1 1 2 plug seal 1 G3 4 plug for draining the cylinder 1 Enclosed documentation 4 3 Dimensions of the product and the connections 4 3 1 Cylinder with 100 litre capacity 563 230...

Page 8: ...fter tight ening them the threaded pins must pro trude out of the nuts 1 Ensure that the wall offers sufficient load bearing capacity to bear the weight of the product when it has been filled Weight w...

Page 9: ...Do not solder the connectors if these have been screwed onto the product Caution Risk of material damage caused by corro sion Due to non diffusion tight plastic pipes in the heating installation air g...

Page 10: ...eating circuit 4 Plug 5 2 Carrying out the wiring Note The temperature sensor is not enclosed but must be ordered separately 1 2 3 1 Screw the sensor pocket 1 into the cylinder 2 Screw the stuffing bo...

Page 11: ...el rising which in turn leads to increased condensation Apply thermal insulation to the water connections the outlet plug on the cylinder and all other pipes in order to limit the heat exchange and th...

Page 12: ...d waste Instead hand in the product to a collection centre for waste electrical or electronic equipment Validity France Disposing of the product Cet appareil et ses acces soires se recyclent Dispose o...

Page 13: ...1 l 202 l Outer diameter of the cylinder 550 mm 600 mm Height of the cylinder 932 mm 1 202 mm Net weight 34 kg 44 kg Weight when filled with water 135 kg 246 kg Material of the cylinder and the connec...

Page 14: ...e au verso 2 4 Service apr s vente Les coordonn es de notre service apr s vente sont indi qu es au verso ou sur le site www vaillant be 2 5 Garantie Informatie over de fabrieksgarantie kunt u bij het...

Page 15: ...amando al n mero de te l fono 910 77 88 77 Condiciones de Garant a Usted puede solicitar la activaci n de su Garant a Comercial y la puesta en marcha GRATUITA si procede seg n su pro ducto a su Servic...

Page 16: ...ation of conformity The declaration of conformity can be viewed at the manufac turer s site 7 2 Guarantee For information on the manufacturer s guarantee you can write to the contact address that is p...

Page 17: ...dt u op het aan de achterkant opgegeven adres of www vaillant nl 9 3 Address Vaillant Group Netherlands B V Paasheuvelweg 42 Postbus 23250 1100 DT Amsterdam Telefoon 020 565 92 00 Consumentenservice 0...

Page 18: ......

Page 19: ......

Page 20: ...eid Tel 49 2191 18 0 Fax 49 2191 18 2810 info vaillant de www vaillant de These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufacturer...

Reviews: