*****INTERNAL*****30 R_D proof- 26.10.2022 / 09:15:46- VaillantGroup\DOC-agt\Brand\VIH_QW_190_6\ENG\OI-II_GB_0020291525
0020291525_04 Installation and maintenance instructions
15
Installation and maintenance
instructions
Contents
Safety .................................................................. 17
Intended use ........................................................ 17
General safety information .................................. 17
Regulations (directives, laws, standards) ............ 18
Notes on the documentation ............................ 19
Further information .............................................. 19
Product description........................................... 19
Heat pump system............................................... 19
Safety devices ..................................................... 19
Functional elements............................................. 20
Serial number ...................................................... 20
Information on the data plate............................... 20
Connection symbols ............................................ 20
CE marking .......................................................... 21
Benchmark........................................................... 21
Energy balance control........................................ 21
Compressor hysteresis........................................ 21
Cooling mode....................................................... 21
Set-up.................................................................. 21
Unpacking the product......................................... 21
Checking the scope of delivery............................ 22
Selecting the installation site ............................... 22
Dimensions .......................................................... 23
Product dimensions for the transport................... 23
Transporting the product ..................................... 23
Removing the casing ........................................... 25
Installing the casing ............................................. 26
Moving the electronics box (optional) .................. 27
Setting up the indoor unit..................................... 27
Removing the carrying straps.............................. 28
Hydraulics installation ...................................... 28
Carrying out the installation preparations ............ 28
Connecting the heat pump to the indoor unit....... 28
Connecting the building circuit............................. 28
Installing potable water pipes .............................. 29
Hydraulic connection ........................................... 29
Connecting the condensate discharge ................ 32
Connecting additional components ..................... 32
Electrical installation......................................... 32
Preparing the electrical installation...................... 32
Electrical partition ................................................ 32
Routing the cables in the product ........................ 33
Establishing the power supply, 1~/230V.............. 33
Establishing the power supply, 3~/400V.............. 34
Requirements for the eBUS line .......................... 35
Opening the control PCB's electronics box ......... 35
Routing the cables in the electronics box ............ 35
Carrying out the wiring......................................... 36
Connecting the circulation pump ......................... 36
Connecting the outdoor temperature sensor ....... 36
Installing the cover for the power supply PCB..... 36
Checking the electrical installation ...................... 37
Operation............................................................ 37
Operating concept of the product ........................ 37
Start-up ............................................................... 37
Filling and purging the heating installation .......... 38
Filling the domestic hot water circuit.................... 39
Purging ................................................................ 39
Switching on the product ..................................... 39
Running the installation assistants ...................... 39
Enabling the electric back-up heater ................... 39
Setting the anti-legionella function....................... 40
Calling up the installer level................................. 40
Checking the configuration .................................. 40
Calling up statistics .............................................. 40
Activating cooling mode....................................... 40
Checking function and leak-tightness.................. 40
Floor drying.......................................................... 40