LAYOUT AND FUNCTION
49
4.4
Installation plan
An installation plan is created for each system and enclosed with the documentation. The overview and loca-
tion of individual components and assembly is also included here. The shorter lengths are given the item num-
ber from the order confirmation.
4.5
Interfaces
The conductor systems is supplied complete. The conductive components of the conductor system are con-
tained in an insulating profile.
4.5.1
Mechanical interfaces
• Customer-side steel structure
• Perfectly aligned, profile upright or (VAHLE) auxiliary support
• On the vehicle side, there is a support bracket for the current collectors which is aligned to the conductor
rail system.
• Please refer to the installation plan for the required system dimensions and tolerances.
4.5.2
Electrical interfaces
• Rubber hose line for VLS infeed
• Customer-side line for VNS infeed
• Tubular cable lug M6 for VLS and M5 + M10 for VNS infeed
• The electrical connection of the feed terminals and current collectors is carried out on site.
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...