LAYOUT AND FUNCTION
47
4.3.22
Path measuring systems
Cost-effective mounting of various path measuring systems.
1 Path measuring system (WCS 3) Mounted with mounting bracket
2 Bar code strip (BCB)
3 Path measuring systems (WCS 3) with separate aluminum profile (bore hole provided by customer)
Grounding of the code rail
When installing the WCS code rail in the VKS10 system, the code rail must be connected to the system poten-
tial at least every 30 m with low impedance.
Grounding
Type
PS-WCS3-EVTP10
Weight [kg] 0.026
ID no.
302 160
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...