
COMMISSIONING
57
5.3.5
Line material
Step 1
Prerequisites:
Clean and tidy workplace.
Required tools:
⚒
Mounting handle
Assembly instructions:
1. Push the conductor rail connector into the open-
ing of the mounting handle.
Step 2
Required tools:
⚒
Mounting handle
⚒
Plastic hammer
Assembly instructions:
1. Hammer the connector into the conductor rail
joint with the mounting handle and a plastic ham-
mer.
CAUTION!
The connector is not reusable. If assembly is unsuc-
cessful or the connection is faulty, please proceed as
described in Chapter: "5.3.6 ".
Step 3
Assembly instructions:
1. Push the connector cap onto the conductor sys-
tem up to the stop.
CAUTION!
Danger of crushing between the individual compo-
nents!
During assembly there is a risk of crushing of the ex-
tremities between the individual components.
►
Take care of your extremities.
►
Wear personal protective equipment. (see Chap-
ter: 2 )
Summary of Contents for VCL Series
Page 95: ...INDEX 93 U Unloading 88...
Page 96: ...CE Technical Documentation...