2.17 Fitting the pre-emergence bout markers
Set the drill on firm ground while hitched to the tractor. Raise or lower the drill until the seed boxes
are a couple of centimetres above the ground. Engage the floating position or turn off the tractor
to release the hydraulic pressure allowing the drill to sink to the ground. Turn off the tractor and
then switch off the Control Station. Do not walk on the wheels during installation since they could
turn.
2.17.1
Frame
Figure 2.18
Install the front part of the frame (B) in the centre of the middle wheel beam of the drill. The mounting
bolts (C) and the frame should be fitted from the left side against two of the fixing eyelets.
Screw together frame parts (K).
Adjust the space (D) to the correct tramline spacing. Verify that this tramline spacing matches the
selected tramlining (see ”
3.21.1 Adjusting track width” on page 63
) and make sure the lateral position
is correct.
B
C
C
D
K
Summary of Contents for Rapid RDA 800S
Page 2: ...2 Ver 2 01 11 2002 ...
Page 4: ...4 ...
Page 73: ...RDA 500 800 S Ver 2 01 11 2002 73 ...
Page 75: ...RDA 500 800 S Ver 2 01 11 2002 75 Figure 5 4 ...
Page 105: ...RDA 500 800 S Ver 2 01 11 2002 105 ...
Page 108: ...Appendices 108 Ver 2 01 11 2002 7 3 2 Hydraulic diagram RDA 800 S Figure 7 2 428718 ...
Page 121: ......