Assembly instructions
18
Ver.2 01.11.2002
2.12 Installation of the Control Station on the tractor
Figure 2.13
Be sure to install the control box securely in the tractor cab. Place the control box within the field
of vision while looking in the travelling direction. Install the bracket as shown in the figure.
NOTE!
Check for hidden cables before drilling holes in the tractor cab.
Connect the cables: Brown to positive (+) and blue to earth (-).
NOTE!
The polarity must not be reversed. If the tractor has an electric socket in the cab, use this.
If there is no socket, connection must be made using an extra cable, preferably 6 mm
2
.
Do not use
a cigarette lighter socket
as the current requirement may be as high as 20 A. It is important to
make a secure connection since poor contact will cause malfunction.
Make sure that the connecting cable to the drill is not trapped under the rear window of the tractor
as this may cause damage. Use a hatch or a hole. Clamp the cable securely onto the tractor to pro-
tect the Control Box from damage if the driver forgets to unscrew the connecting cable when un-
hitching the drill.
NOTE!
Keep the Control Station switched off until the bout markers have been installed.
Now it is time to unfold the drill. Check that the Control Station is switched off.
NOTE!
The following harrow and bout markers etc may be secured to the wheels or the platform
during transport and must be released before unfolding.
Before unfolding, see
”3.5 Switching between transport and working modes” on page 28.
Unfolding must always be performed with the drill fully raised
.
Release the locking devices
before unfolding.
Summary of Contents for Rapid RDA 800S
Page 2: ...2 Ver 2 01 11 2002 ...
Page 4: ...4 ...
Page 73: ...RDA 500 800 S Ver 2 01 11 2002 73 ...
Page 75: ...RDA 500 800 S Ver 2 01 11 2002 75 Figure 5 4 ...
Page 105: ...RDA 500 800 S Ver 2 01 11 2002 105 ...
Page 108: ...Appendices 108 Ver 2 01 11 2002 7 3 2 Hydraulic diagram RDA 800 S Figure 7 2 428718 ...
Page 121: ......