page 7 of 51
Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check carefully
the validity of this document with respect to his product. manual-no.: 999073 / 15/12/2009
➨
Isolate equipment from mains
and
wait two minutes
before starting mainte-
nance to allow the capacitors to discharge.
☞
Ensure that the pump cannot be operated accidentally. Never operate the pump
if covers or other parts of the pump are disassembled. Never operate a defec-
tive or damaged pump.
☞
Attention
: The pump might be contaminated with process chemicals which have
been pumped during operation. Ensure that the pump is decontaminated before
maintenance and take adequate precautions to protect people from the effects of
dangerous substances if contamination has occurred.
☞
Before starting maintenance vent the pump, isolate the pump and other compo-
nents from the vacuum system. Allow sufficient cooling of the pump. Drain conden-
sate, if applicable. Separate the pump from the coolant circuit.
Repair of the
gauge head VSK 5
is
not
possible.
In order to comply with law (occupational, health and safety regulations, safety at work
law and regulations for environmental protection) vacuum pumps, components and
measuring instruments returned to the manufacturer can be repaired only when certain
procedures (see section
”Notes on return to the factory”
) are followed.