3N0/3NK/3PD/3PG
1-4-19
(5) Electrical parts that could cause paper jam at the DF process part
Timing of detection
Corrective Action
Jam code
J6500,J651x,J6600,J6610
Related parts
DF middle motor (DFMM)
DF main PWB(DFMPWB)
DF drum motor (DFDRM)
DF bundle eject sensor (DFBDS)
DF drum sensor (DFDRS)
DF feedshift solenoid 1 (DFDRSOL)
Checking
procedure at the
occurrence of
J65XX
Corrective action at the occurrence of
J65XX
On/Off control signal output connector
(terminal), point of checking connection
1
Items for Initial Checks
see page 1-4-7
2
DF middle sensor (DFMES):Conduct
connectivity check, mounting location
check, operation check (U241)
DF main PWB YC20-6
3
DF bundle eject sensor (DFBDS) :
Conduct connectivity check, mounting
location check, operation check (U241)
DF main PWB YC22-27
4
DF middle motor (DFMM) : Operation
check (U240)
DF main PWB YC12-9 to 12
5
DF main PWB(DFMPWB) : Replace
Checking
procedure at the
occurrence of
J66XX
Corrective action at the occurrence of
J66XX
On/Off control signal output connector
(terminal), point of checking connection
1
Items for Initial Checks
see page 1-4-7
2
DF drum sensor (DFDRS) : Conduct
connectivity check, mounting location
check, operation check (U241)
DF main PWB YC20-3
3
DF feedshift solenoid 1 (DFDRSOL):
Check to see the feedshift guide 1 is
switchable (U240)
DF main PWB YC18-12,13
Summary of Contents for AK 740
Page 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 4: ...Revision history Revision Date Pages Revised contents ...
Page 5: ...This page is intentionally left blank ...
Page 11: ...This page is intentionally left blank ...
Page 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Page 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Page 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Page 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Page 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Page 170: ...AK 740 Bridge unit Installation Guide ...
Page 172: ...MT 730 B Mail box Installation Guide ...