3N0/3NK/3PD/3PG
1-3-7
U240
Checking the operation of the finisher
Description
Turns each motor and solenoid of 1000-sheet finisher or 3000-sheet finisher ON.
Purpose
To check the operation of each motor and solenoid of the 1000-sheet finisher or 3000-sheet fin-
isher .
Method
1. Press the start key.
2. Select the item to be checked.
Method: [Motor]
1. Select the item to be operated.
2. Press the start key. The operation starts.
Item No.
Description
Display
Description
Motor
Checking the motor of the document finisher
Solenoid
Checking the solenoid of the document finisher
Mail Box
Checking the motor of the mailbox
Display
Description
Feed In(H)
DF paper entry motor (DFPEM) is turned on at high speed
Feed In(L)
DF paper entry motor (DFPEM) is turned on at low speed
Middle(H)
DF middle motor (DFMM) is turned on at high speed
Middle(L)
DF middle motor (DFMM) is turned on at low speed
Eject(H)
DF eject motor (DFEM) is turned on at high speed
Eject(L)
DF eject motor (DFEM) is turned on at low speed
Save(H)
DF drum motor (DFDRM) is turned on at high speed
Save(L)
DF drum motor (DFDRM) is turned on at low speed
Tray
DF tray motor (DFTM) is turned on
Operating sequences:
Ascends after descending to the bottom limit; descends again
in one second after the intermediate sensor is detected to be
off; ascends again after the intermediate sensor is detected to
be on; then halts at the top limit.
Staple Move
DF slide motor (DFSLM) is turned on
Staple
DF staple motor (DFSTM) is turned on
Width Test(A3)
DF side registration motor 1, 2 (DFSRM1, 2) is turned on
Width Test(LD)
DF side registration motor 1, 2 (DFSRM1, 2) is turned on
Beat
DF paddle motor (DFPDM) is turned on
Eject Unlock(HP)
DF eject release motor (DFERM) is turned on to home position
Summary of Contents for AK 740
Page 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 4: ...Revision history Revision Date Pages Revised contents ...
Page 5: ...This page is intentionally left blank ...
Page 11: ...This page is intentionally left blank ...
Page 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Page 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Page 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Page 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Page 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Page 170: ...AK 740 Bridge unit Installation Guide ...
Page 172: ...MT 730 B Mail box Installation Guide ...