Instruction Manual
Defender Gate
™
10 & 20
Page 1: ...Instruction Manual Defender Gate 10 20 ...
Page 2: ...ould line up with the skid plate Door Opening Size A 2 3 inches between the wall and the gate CENTERLINE MEASUREMENT INSIDE BASE TO INSIDE BASE B 1 2 Inside base to base C Defender Gate 20 shown The Defender Gate 10 or 20 arrives in three pieces securely wrapped and attached to a pallet All hardware is included Congratulations on making your loading dock the safest in the world Shipment Contains 1...
Page 3: ... depth of 5 inches using the bollard as a guide Place washer and nut on bolt before striking With bollard in place insert 7 5 8 x 6 anchor bolts with a hammer Measure distance B from inside edge of the HINGE BOLLARD baseplate to the inside edge of the LATCH BOLLARD baseplate Make sure the distance from the wall or frame is the same as the HINGE BOLLARD Repeat steps 3 7 to install LATCH BOLLARD Lev...
Page 4: ...n place on hole for pivot pin With the GATE still folded insert gate pivot pins into the HINGE BOLLARD holes Be sure the handles are on top and stripes are facing you Move GATE slightly back forth until GATE is firmly seated Insert hitch pins into the 2 pivot pins on the GATE Open gate and check leveling at multiple points Close the gate drop the closure pin in and lock A slight leveling adjustment...
Page 5: ...1 800 331 2973 www usnetting com ...