Part
Description
Quantity
A
Crossbar
1 pc.
1 pc.
2 pcs.
2 pcs.
2 pcs.
2 pcs.
Fixture Body
B
C
D
E
F
Hex Nut
Lock Washer
Package Contents
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing
the fixture. We strongly recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool
before removal. Do not subject glass parts to any shock while in operation or shattering may result.
Mounting Ball
Mounting Screw
1of5
Tools
Required:
Flathead
screwdriver,
Phillips screwdriver, pliers, wire
cutters, wire
strippers, electrical tape, safety glasses.
Bul
b
Recommended:
Integrated LED
Estimated Assembly Time:
20-30 minutes
Preparation:
Identify and
inspect all parts before
beginning
installation. Check package
content list and diagrams below
to
be sure all parts are present. If any parts are missing
or damaged, do
not attempt to
assemble, install, or operate
the
fixture. Contact customer
service
for replacement parts.
A
B
C
D
E
F
Installation Instructions:
UQL
1
1
6
2
www.urbanambiance.com