Operation
Section
LX 31/41 Work Platform
3-10
3.6 Fold Down Guardrails
(Figure 3-2)
This procedure is only for passing through doorways.
Guardrails must be returned to proper position before
using the machine.
FOLD DOWN PROCEDURE
(FIGURE 3-2)
Note: When performing the following procedures
retain all fasteners.
1. Place controller on platform.
2. Starting at the front of the platform, remove nuts,
bolts and washers from the top of the front guard-
rail. Fold the front guardrail down onto the plat-
form.
3. Close and latch the gate.
4. Remove nuts, bolts and washers from the top of the
rear guardrail. Fold the rear guardrail down onto
the platform being careful to keep gate latched at
all times.
5. Remove nuts, bolts and washers from the top of the
side guardrails. Lift up and fold one side guardrail in
so it rests on the deck. Repeat with other side
guardrails.
ERECTION PROCEDURE
1. Raise side guardrails making sure each is pushed
down to secure the guardrail in the vertical posi-
tion.
2. Install bolts, washers and nuts between the side
guardrails, tighten securely.
3. Raise rear guardrail assembly, aligning holes and
install bolts, washers and nuts. Tighten securely.
4. Raise front guardrail, aligning holes and install bolts,
washers and nuts. Tighten securely.
5. Hang controller from front guardrail.
6. Before operating work platform check that all
fasteners are in place and properly torqued.
Before operating machine, guardrails must be
securely fastened in their proper position.
Figure 3-2: Fold Down Guardrails
3.6
Summary of Contents for LX31
Page 1: ...Publication Number 067904 000 ...
Page 4: ...LX 31 41 Work Platform ii Foreword NOTES ...
Page 56: ...Section Troubleshooting 5 4 LX 31 41 Work Platform 5 1 NOTES ...
Page 91: ...Schematics Section 6 35 LX 31 41 Work Platform Figure 6 19 Hydraulic Manifold 6 3 ...
Page 92: ...Section 6 36 LX 31 41 Work Platform Schematics 6 3 NOTES ...