Uponor KaMo Combi Port E Installation And Operation Manual Download Page 1

Combi Port E

EN

Installation and operation manual

CD0000289

Summary of Contents for KaMo Combi Port E

Page 1: ...Combi Port E EN Installation and operation manual CD0000289...

Page 2: ...6 Electrical installation 17 6 1 Connecting the heat interface unit 17 7 Additional installation 18 7 1 Heat meter or cold warm water meter 18 7 2 Strainer 19 7 3 Filling flushing and venting 19 7 4 T...

Page 3: ...products approved or specified by Uponor is not connected to or used with non Uponor products parts or components except for those approved or specified by Uponor and does not show evidence of tamper...

Page 4: ...able vapours or gases Uponor cannot accept any responsibility for damage or breakdown that can result from ignoring these instructions 2 2 Standards and regulations Note The installation must be carri...

Page 5: ...for details of where and how they can take this item for environmentally safe recycling Business users should contact their supplier and check the terms and conditions of the purchase contract This p...

Page 6: ...aration between heating and tap water side secures that no heating of the cold water pipes takes place Domestic hot water The domestic hot water is generated only on demand with an integrated controll...

Page 7: ...er RTB or differential pressure regulator G Strainer H Venting screw I Pump J Bypass valve K Heat meter distance piece L Draining and filling valve M Connection swivel nut Connection description CD000...

Page 8: ...e Base Pulse Base PRO Autobalancing Cooling function Modularity Installation and configuration functions Wave Pulse Base Pulse Base PRO Installation wizard Offline configuration Over the air updates T...

Page 9: ...Item Description A Differential pressure regulator B Return temperature limiter RTB Differential pressure regulator or return temperature limiter RTB can be connected on demand Tap water circulation C...

Page 10: ...port or installation Check the nuts to ensure that they are properly tightened before the connection to avoid property damages Before installing Combi Port E ensure that the primary pipes are laid in...

Page 11: ...parations SI0000295 A B C Item Description A Cabinet body B Frame C Door 1 Dismount the frame and door 2 Store the frame and door for later mounting Adjusting the in wall cabinet The in wall cabinets...

Page 12: ...the enclosed plugs in the drilled holes and place the in wall box in the wall aperture SI0000305 A Item Description A Plug 4 pcs 4 Secure the in wall mounting box to the wall aperture and secure with...

Page 13: ...m Description A Flat gasket Note Check the flat gasket for damage 4 Tighten the swivel nuts Connecting the pipes Note Install the pipes in accordance with planning documentation Note Ensure the use of...

Page 14: ...lt 6 pcs 1 Mark the hole positions on the wall and drill holes using a 6 mm drill 2 Insert the plug in the drilled holes Note See the dimensional drawings for measurements Pay attention to the horizon...

Page 15: ...Item Description A Circulation line B Room temperature control C Heating circuit secondary 2nd D Return temperature sensor E Differential pressure regulator Install the circulation line SI0000302 1 Co...

Page 16: ...itional information Note Visit the download centre for more information regarding the configuration of Uponor Smatrix and Uponor Base flexiboard Install the heating circuit secondary Note Please read...

Page 17: ...to Combi Port E in accordance with the wiring diagram see Wiring diagrams Page 30 2 Pull the battery protection foil on the right hand side of the heating station controller 3 Option Connect the BUS o...

Page 18: ...s recorded by adding a heat meter with a fast scanning frequency that fully measures the volume flow rate every 3 4 seconds including kWh calculation Sensor pocket heat meter The sensor pocket M10x1 i...

Page 19: ...ccording to the applicable guidelines 2 Fix any leaks immediately 7 5 Visual inspection Caution Improper commissioning can lead to property damage Note If an installation error is found during visual...

Page 20: ...valve on site at a suitable central point to fill the central heating system Hydraulic scheme Observe the hydraulic diagram as an installation guide M M C D E G K L M N B A A WD0000032 I F H G M J Ite...

Page 21: ...ating constant pressure Step 4 2 x 1 4 3 x 2 4 4 x 3 Pump effect EEI 0 20 Part 3 Value Speed P1 W Min 2 Max 33 Pump operation Display view Operation settings 0 P1 25 25 P1 50 50 P1 75 75 P1 100 Pump a...

Page 22: ...F SI0000301 1 Download the Combi Port E app It is available both for iOS and Android mobile devices 2 Scan the QR code available on the Combi Port E controller 3 Press the blue button in the middle of...

Page 23: ...cation returns to the foreground Polling interval Interval in seconds in which displayed values are updated Increase value to consume less battery charge Changes are applied when reconnecting 1 s Lang...

Page 24: ...er OFF Room controller POSSIBLE SETTINGS Operating mode Control mode Time program Heating curve optional ECO mode heating DISPLAYED VALUES Supply secondary Return secondary Outdoor temperature optiona...

Page 25: ...line The heat interface unit is equipped with a central shut off ball valve for cold water B As an option there is a shut off ball valve for installation purposes All ball valves should be exercised...

Page 26: ...he display Hotwater Check the controller setting Check setpoints via the App in the display Hot water Waiting time for hot water is too long Check the pump setting in the central heating system Pump s...

Page 27: ...ral heating circuit pump not working Check that the central heating circuit pump is working and correctly set Central strainer is dirty Clean the central strainer Heating system is not working correct...

Page 28: ...0 W Contacts Description Marking L2 X3 Phase Black Brown Circulation pump N Neutral Blue Circulation pump PE Protective conductor Green Yellow Circulation pump L3 X4 Phase Black Brown Heating pump 1 N...

Page 29: ...Modbus terminal 11 3 Data output Current measured values controller status and output states can be read and value settings changed in an external device e g computer RS485 interface 4 pin terminal X...

Page 30: ...6 M 7 BU BN N L 3 1 2 4 5 6 M 8 BU BN N L 3 1 2 4 5 6 M 9 BU BN N L 3 1 2 4 5 6 M 10 BU BN N L 3 1 2 4 5 6 M 11 BU BN N L 3 1 2 4 5 6 M 12 BU BN N L 3 1 2 4 5 6 RTA N L L 1 RTA N L L 2 RTA N L L 3 RT...

Page 31: ...PP cover W Uponor Base flexiboard controller X Zone valve for limiting heating flow to apartment Y Potential free heat circuit distributor cable optional Description of connection symbols For descript...

Page 32: ...L G M R H H B W R R R T Q I O J R N O Q A V A T2 R Fuse T3 15A M 7 BN BU M 8 BN BU M 9 BN BU M 10 BN BU M 11 BN BU M 1 BN BU M 2 BN BU M 3 BN BU M 4 BN BU M 5 BN BU M 6 BN BU 12 L L PUMP L N BOILER 2...

Page 33: ...ss V EPP cover W Uponor Smatrix Wave Pulse room controller X Zone valve for limiting heating flow to apartment Y Potential free heat circuit distributor cable optional Description of connection symbol...

Page 34: ...M R H H B W R R R T Q I O J R N O Q A V A T2 R Fuse T3 15A M 7 BN BU M 8 BN BU M 9 BN BU M 10 BN BU M 11 BN BU M 1 BN BU M 2 BN BU M 3 BN BU M 4 BN BU M 5 BN BU M 6 BN BU 12 L L PUMP L N BOILER 24 V L...

Page 35: ...ss V EPP cover W Uponor Smatrix Base Pulse room controller X Zone valve for limiting heating flow to apartment Y Potential free heat circuit distributor cable optional Description of connection symbol...

Page 36: ...ainer H Venting screw I Pump J Bypass valve K Heat meter distance piece L Draining and filling valve M Connection ball valve N Circulation pump optional O Backflow preventer P Insert strainer Q Flow s...

Page 37: ...2 h4 w w 1 l b b b1 h3 h4 h4 ZD0000018 l w w1 h2 h3 h4 b b1 560 648 630 132 140 40 60 180 In wall cabinet 750 x 850 w w 1 l h1 ZD0000015 l1 w 3 h w 2 l l1 w w1 w2 w3 h h1 795 750 901 5 850 849 5 22 85...

Page 38: ...ixtures must be included Domestic hot water side secondary DI0000098 1 00 0 40 0 50 0 60 0 70 0 80 0 90 0 30 0 20 0 10 0 00 2 0 4 0 6 0 8 0 10 0 A B 12 0 14 0 16 0 18 0 20 0 22 0 C Item Description A...

Page 39: ...ating supply temperatures C Tapping capacity in litres minute l min D Max range Tapping capacity DI0000102 40 35 30 25 20 15 10 5 0 2 4 6 8 10 12 14 16 18 20 22 A B 55 C 60 C 65 C 70 C 75 C 80 C 85 C...

Page 40: ...l min D Max range Tapping capacity DI0000106 40 35 30 25 20 15 10 5 0 2 4 6 8 10 12 14 16 18 20 22 A B 65 C 70 C 75 C 80 C 85 C Item Description A Return temperature C B Tapping capacity in litres min...

Page 41: ...C 50 C 60 C 70 C 75 C 80 C 85 C Item Description A Primary heating demand in litres hour l h B Primary heating supply temperatures C Tapping capacity in litres minute l min D Max range Tapping capaci...

Page 42: ...ating supply temperatures C Tapping capacity in litres minute l min D Max range Tapping capacity DI0000114 40 35 30 25 20 15 10 5 0 18 2 4 6 8 10 12 14 16 20 22 24 A B 60 C 65 C 70 C 75 C 80 C 85 C It...

Page 43: ...0116 40 35 30 25 20 15 10 5 0 18 2 4 6 8 10 12 14 16 20 22 24 A B 65 C 70 C 75 C 80 C 85 C Item Description A Return temperature C B Tapping capacity in litres minute l min Combi Port E Installation a...

Page 44: ...to make changes without prior notification to the specification of incorporated components in line with its policy of continuous improvement and development www uponor com 1096053 v1_01_2020 Producti...

Reviews: