Uplift Desk PDC005 Manual Download Page 1

For further info or assistance, visit upliftdesk.com
call 800-349-3839 or email [email protected]

Patent Pending, ©2020 UPLIFT Desk®. All Rights Reserved

355 lb

two person 

assembly

Power & Data Rail

Modular system for power and data solutions.

®

Summary of Contents for PDC005

Page 1: ...assistance visit upliftdesk com call 800 349 3839 or email support upliftdesk com Patent Pending 2020 UPLIFT Desk All Rights Reserved 355lb two person assembly Power Data Rail Modular system for power...

Page 2: ...s PDC005 TRAY LNG Long Rail Assembly PDC005 RAIL LNG Short Rail Assembly PDC005 RAIL SHT Square Post PDC005 POST SQ Dual Row End Foot PDC005 FOOT DE Single Row End Foot PDC005 FOOT SE Dual Row Center...

Page 3: ...s to power outlets is limited and eliminate cable clutter and the need for extension cords The Power and Data Rail was designed to position UPLIFT V2 and V2 Commercial desks with con sistent alignment...

Page 4: ...mended height setting indicator lines on the Bottom Post for UP LIFT V2 and UPLIFT V2 Commercial desks Using the included 3mm Allen Wrench loosen the the two M6x6 Set Screws so the Upper Post can slid...

Page 5: ...arge holes in each of the Feet are designed to accept the level ing glides at the back of the UPLIFT V2 and UPLIFT V2 Commerical desk feet This pat ent pending feature helps to keep your desks aligned...

Page 6: ...Remove the hardware and other components from inside the Rail assemblies and set them aside for later also Step 3 A Move one of the Rail assemblies to the first two Posts in your configuration Slide t...

Page 7: ...the Post feet with the leveling glides in the back of the desk feet as shown Then lift the desk slightly on each side and set the desk glides into the Post feet holes If you are assembling a Dual Side...

Page 8: ...Shape you will be connecting Rail assemblies to other sides of the Square Posts Follow the same Rail Extension attachment process as shown in the section Assembly Linear Configurations Page 6 Step 3...

Page 9: ...for UP LIFT V2 and UPLIFT V2 Commercial desks Using the included 3mm Allen Wrench loosen the the two M6x6 Set Screws so the Upper Post can slide B If you are using the Power and Data Rail with UP LIFT...

Page 10: ...tion or the Dog Bone Shape Configuration 3 Pack Configuration If you are just putting togeth er three 120 Degree desks follow the instructions in Steps 2 4 on this page Dog Bone Shape Configuration If...

Page 11: ...r the junction box for hardwire power infeeds with the Power Infeed hole facing the power source Step 6 Dog Bone Shape Configuration A Assemble the 3 Pack configurations per the in structions in the p...

Page 12: ...t 36 5 of the infeed coming out of the post if you are build ing a row of 42 desks but only 21 5 for a row of 72 desks B Run your Power Infeed in the orientation shown from the middle of the Rail thro...

Page 13: ...s and will require two Jumpers to connect all three Rails B Follow the Power Infeed and Jumper installation procedures described in Steps 1 and 2 of this sec tion C You may find it helpful to temporar...

Page 14: ...Undercut Step 1 Slide the Byrne Bracket onto the bottom of the By rne Power Block in the orientation shown so that the Bracket tabs slide into the undercuts on each end of the Power Block You should...

Page 15: ...se screws all the way Step 4 A Byrne Duplex Receptacles are keyed to install one way make sure the tab on each Receptacle is facing up Insert each Receptacle into one of the cavities in the Power Bloc...

Page 16: ...wn line neutral and isolated ground conductors The Byrne 8 Trac System can be wired in both single and three phase config urations 240 120V 208 120V respectively see Byrne 8 Trac wiring diagram below...

Page 17: ...unt solder style www Byrne com Note Please verify fit of jack in adapter before ordering large quantities as manufacturer designs may change without notice Data Cable Hanger qty 2 Blank Plate qty 2 op...

Page 18: ...talling data in a particular data open ing insert one of the included Blank Plates Step 3 A Pull your cables out through the data window in the side of the Power Data Rail from the inside B Connect a...

Page 19: ...d tighten using the 3mm Allen Wrench but do not over tighten to avoid stripping If you are installing Privacy Panels on top of the Rails install only two of the M5x6 Screws in the center of the Rail C...

Page 20: ...esk website upliftdesk com Excerpts or copies may not be forwarded to third parties or used in any other published form without the prior written consent of UPLIFT Desk These instructions are subject...

Reviews: