background image

INSTRUCTION PUMP INSTALLATION FOR CHEFTOP-BAKERTOP OVENS
ISTRUZIONI MONTAGGIO POMPA ULKA SUI FORNI CHEFTOP-BAKERTOP
INSTRUKCJA INSTALACJI POMPKI W PIECACH CHEFTOP-BAKERTOP 

XC665

A

C

B

D

ENGLISH

ESPAÑOL

POLSKI

DEUTSCH

ITALIANO

- Rimuovere tubi, riduttore di pressione e raccordo
“T” dal collegamento idrico nell’ingresso (WATER

- Remove the tubes, the pressure reducer, and the
T conncection from the oven water connection inlet

LI1491A0

“T” dal collegamento idrico nell’ingresso (WATER
IN) del forno all’elettrovalvola (Immagine A).
- Connettere

la

pompa

Ulka

in

serie

all’elettrovalvola

per

l’alimentazione

dell’acqua

(Immagine B).

N.B.

: Ogni gruppo di resistenza-ventola (quindi per

ogni elettrovalvola) necessita di 1 pompa.
- Connettere i fili della pompa Ulka in parallelo ai
connettori dell’elettrovalvola (Immagine C).

N.B.

: Il collegamento elettrico della pompa alla

bobina

superiore

o

inferiore

dell’elettrovalvola

dipende dalla portata d’acqua di ciascun forno
(Vedere tabella in allegato).
- Con

la

pompa

installata

e

collegata

all’elettrovalvola,

praticare

con

un

cutter

una

incisione verticale su uno dei tappi in gomma sul
panello posteriore del forno per far passare il tubo
di pescaggio della pompa Ulka. Immergere il
pescante

in

un

contenitore

di

acqua

demineralizzata (Immagine D).

T conncection from the oven water connection inlet
(WATER IN) to the electrovalve (Pictrure A).
- Connect the Ulka pump in series to the solenoid
valve for water supply (Picture B).

N.B.

Each group of heating elements-fan (for each

electrovalve) need 1 pump.
- Connect the Ulka pump cables in parallel to the
electrovalve connection (Picture C).

N.B.

The electrical conncection of the pump to the

upper or lower coil of the solenoid valve depends
on the water flow of each oven (see the attached
table).
- When the pump installed and connected to the
solenoid valve, drill a vertical incision with a cutter
on one of the rubber stoppers on the back panel of
the oven to pass the draft pipe of the Ulka pump.
Immerge

the

draft

in

a

container

with

demineralized water (picture D).

- Zdjąć przewody, reduktor ciśnienia oraz złączkę w 

kształcie litery T z przewodu doprowadzającego 

wodę (WATER IN) do elektrozaworu (Rysunek A).

- Podłączyć pompę Ulka szeregowo do zaworu 

solenoidalnego na dopływie wody (Rysunek B).

UWAGA: Każdy zestaw elementów grzewczych – 

wentylator (dla każdego elektrozaworu) potrzebuje 

1 pompy.

- Podłączyć równolegle kable pompy Ulka do 

złączy elektrozaworu (Rysunek C).

UWAGA: Podłączenie elektryczne pompy do górnej 

lub dolnej cewki zaworu solenoidalnego zależy od 

przepływu wody w każdym z pieców (patrz 

załączona tabela).

- Po zainstalowaniu pompy i podłączeniu jej do 

zaworu solenoidalnego naciąć pionowo za pomocą 

nożyka jedną z gumowych przelotek na tylnym 

panelu pieca, aby przeprowadzić przez nią 

przewód ssący pompy Ulka. Zanurzyć przewód 

ssący w pojemniku ze zdemineralizowaną wodą 

(Rysunek D).

Reviews: