background image

P a g e

 | 4

 
 

 

ÜKY/DUO Boiler User Manual 

 

SELECTION OF INSTALLATION PLACE 

 
The place where the boiler is installed must have enough free space for the installation, burning and 
maintenance  of  the  boiler.  For  the  service  need,  the  gearbox  and  the  group  to  which  the  shaft  is 
connected  should  be  distant  from  the  wall  to  easily  come  out.  For  this,  the  dimensions  in  the 
paragraph titled “Mounting location dimensions” should be applied. 
In addition, there should be a sufficient amount of clean air circulation for efficient combustion, the 
chimney  design  must  meet  the  required  traction  values  for  the  model  used  and  comply  with  the 
construction criteria and related regulations given in the manual. The boiler should never be installed 
in  open  spaces,  balconies,  living  areas  (kitchen,  living  room,  bathroom,  bedroom),  in  places  with 
explosive and easily flammable materials. 
The  door  of  the  boiler  room  should  not  be  opened  directly  to  the  escape  staircase  or  general  use 
stairs and must be opened to a security hall. There should be at least one door in boiler rooms with 
thermal capacities between 50 kW and 350 kW, and at least 2 exit doors in boiler rooms with a floor 
area above 100 m2 or with a thermal capacity above 350 kW. The exit doors should be placed in the 
opposite direction of each other as much as possible, they should be resistant to fire for at least 90 
minutes, smoke-tight and capable of self-closing. 
At least one of the doors must open directly outside and outside the building. If it is possible to open 
a door directly outside the building from the boiler room, this is the most suitable solution. The door 
of the boiler room should not be opened directly to the escape staircase or general use staircase and 
must be opened to a common hall or corridor. 
A threshold of at least 10 cm height is recommended for the doors opening from the boiler room into 
the  building.  If  it  is  possible  to  illuminate  the  boiler  room  naturally,  it  should  be  noted  that  the 
lighting  openings  do  not  come  under  other  windows  of the  building.  If  artificial  lighting  is made,  a 
system that does not dazzle but brightens the apartment should be installed. The main switches and 
panels belonging to the boiler room should be placed around the entrance door and should be leak-
proof type. A fire tube must be kept in the boiler rooms. 
One of the purposes of placing the boiler on the concrete base in the boiler room is to prevent the 
fan from sucking dust from the floor. Ventilation can be done naturally or algebraically. It should be 
ensured  that  the  fresh  air  inlet  chimney  mouth  is  at  the  ground  level  and  the  dirty  air  tapping 
chimney mouth is at the ceiling level. 
At least 1 6 kg multi-purpose dry chemical powder extinguishing device should be kept in the boiler 
room.  
If natural gas or liquid fuel boilers are also used in the same boiler room, the tear surface must be 
designed. 
The established place must have grilles which are directly 
connected to the external environment and allow fresh air 
to  enter.  One  of  the  culverts  should  be  at  most  40  cm 
below the boiler room ceiling and the other should be at 
most  50  cm  above  the  floor.  These  culverts  should  be 
constantly open.  The  lower  grill  must  be  at  least 40 x  40 
cm  and  the  top  grill  must  be  at  least  30  x  30  cm.  Pets 
should not be fed in the heating area (boiler room), smoke 
and  food  and  beverage  that  may  be  affected  should  not 
be stored.  

Summary of Contents for UKY/DUO 100

Page 1: ...KY DUO Boiler User Manual NL SOY Yap Malzemeleri Sanayi ve Ticaret Ltd ti Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R Tel 444 35 32 Faks 0232 469 2412 www unmak com...

Page 2: ...ONS 6 ELECTRICAL INSTALLATION INSTRUCTIONS 8 INFORMATION ABOUT COMBUSTION 10 BOILER FEATURES 12 RULES FOR HEATING INSTALLATION 15 CONTROL PANEL AND USER INTERFACE 19 STARTING UP 21 FUEL FEEDING STAND...

Page 3: ...re used only for heating installations not directly for domestic water heating However it can produce hot tap water with the help of a boiler or heat exchanger The energy required for the domestic wat...

Page 4: ...transportation rope through the forklift stands on the chassis and carrying the boiler with the help of a crane or hoist care should be taken not to damage the painted thin sheets of the boiler and t...

Page 5: ...ble solution The door of the boiler room should not be opened directly to the escape staircase or general use staircase and must be opened to a common hall or corridor A threshold of at least 10 cm he...

Page 6: ...dimensions The boiler room should be sized to provide the minimum dimensions given in the picture below While placing the boiler it is necessary to leave sufficient distance for the fuel to be added...

Page 7: ...ver be used in chimney construction It should be plastered inside and outside and cylindrical pipe inserted into the rectangular chimney It should be ensured that fresh air always enters the area wher...

Page 8: ...llation water flow rate and the boiler capacity and the 20 C difference between the boiler inlet and outlet water temperatures are not exceeded To minimize the completion of water lost in the installa...

Page 9: ...te hot dip or c Solid copper rod should be made with electrodes Copper rod electrodes must be at least 1 5 m in diameter of 16 mm or at least 1 25 m in diameter of 20 mm and the earthing resistance of...

Page 10: ...P a g e 9 KY DUO Boiler User Manual Control panel electrical connection diagram...

Page 11: ...e flue to the atmosphere The material the way of construction and the connection of the chimneys are important in terms of high combustion efficiency low heating cost and protection of the environment...

Page 12: ...el may be preferred In order to prevent condensation thermal insulation should be applied to the space between the inner and outer surfaces of the chimney At the lowest level of the chimney there must...

Page 13: ...rs to circulate the water and circulate the smoke As the smoke passes between them it releases its energy and heats the water inside 3 Water grid They are the pipes for burning Water passes through th...

Page 14: ...safety due to heating in the boiler 14 Safety return line It is the line where the water sent to the expansion tank is taken back to ensure safety from the boiler 15 Chimney hood It is the boiler sec...

Page 15: ...31 33 33 35 35 40 Temperature Control Range o C 40 90 Return Temperature Recommended o C 40 Maximum Operating Pressure bar 3 Test Pressure bar 5 Dimensions Boiler Width A mm 1090 1185 1272 Depth B mm...

Page 16: ...er to prevent the pump shaft from pressing the housing or the outer cover during operation Expansion tank In hot water heating systems when the water is heated from 10 C to 90 C its volume increases b...

Page 17: ...boilers must be connected to an installation with an open expansion tank in accordance with the installation scheme shown below The circulation pump can be connected on the flow or return line In case...

Page 18: ...essary measures are taken after the first filling there is no damage caused by the oxygen in the water Oxidation is mostly caused by oxygen which is involved in the heating water during operation The...

Page 19: ...nstallation Considerations for heating connected to old installations A long term heating system produces a protective layer black magnetite on metal surfaces in contact with water When a new boiler i...

Page 20: ...on Used to open and close the control panel button Used to input new value to the device Fan Adjustment Temperature Adjustment Fuel Feeding Fuel Standing ENTER Used to store set values and to access s...

Page 21: ...e of the boiler is switched on and off with this button Fan On Off The fan of the boiler is switched on and off with this button Manual Fuel Feed It is used to load manual manual fuel into the boiler...

Page 22: ...s and HEATING is not seen because the buttons are not pressed and the boiler does not work Open the boiler lower cover and hold the finger on the Manual Fuel Feed button on the control panel to allow...

Page 23: ...r right side of the control panel will illuminate and HEAT will appear on the display If the ignition aids in the boiler ignite the fuel press the Reducer On Off button to switch on the gear unit The...

Page 24: ...oal type can burn in an automatic combustion pot By changing the supplied feeding and waiting settings for this you can catch the most suitable burning setting for the boiler When there is no coal in...

Page 25: ...cleaned Check that the fan is working properly Unbalanced balanced fan makes periodic noises If there are dust or ash collected between the fins of the fan it is necessary to clean it by blowing it wi...

Page 26: ...l reservoir hopper Check that there are no holes or cracks in the chimney If you still can t consult your leg Have your chimney sealed Excessive fuel consumption Poor use of fuel may be High chimney t...

Page 27: ...astic cover on the back of the control panel Activate the limit thermostat by pressing the red pin Turn the control panel off and on Panel over fuel warning is on Fuel in hopper The probe may be displ...

Reviews: