background image

 

 

Assembly Instructions for Z-Matter 

 

Installing 

ZMatter

 into your Polisy is pretty straight forward.  

Preparations

1.

 

If your Polisy has been collecting dust for more than a year, the first thing you 

need to do is to freshen it up. Here’s 

how you do it

. Once done, you can access 

your Polisy just like you did your ISY994. Here’s 

how to do so

. 

2.

 

If you have not already migrated your ISY994 to Polisy, that’s the first thing you 

need to do. Migration is easy and you can even use your existing PLM for 
INSTEON/X10 communications. Here are 

the instructions

. 

3.

 

You will be sent 

further instructions

 for the required IoX version and how-tos for 

untapping our additional features and enhancements by 12/01/2022.  
 

Installation Instructions

1.

 

Unplug Polisy from power 

2.

 

Take off the top panel by unscrewing the 4 screws on the sides (2 on each side) 

3.

 

Connect the SMA side of the antenna wires into the two holes on each side of the 
top panel  
 

 

 
 
 

Reviews: