Distribution Option Kit Installation
Sageon III Power System
PM990-8800-00, Rev. 9
7-6
10.
Tighten all hardware. Refer to Table 2-2 for torque specifications.
11.
Repeat the above steps for each AM1 distribution assembly kit to be installed.
12.
From the kit(s), collect the Failure Alarm (FA) jumper wire(s).
13.
Connect one end of each wire to the push-on terminal on the edge of a newly installed distribution assembly. Connect the
other end to a convenient push-on connector on an adjacent distribution assembly in daisy chair fashion. Newly installed
distribution assemblies must be connected (in daisy chain fashion) to a previously installed distribution assembly.
See Figure 7-4.
14.
Refer to Chapter 8 to install AM1 circuit breakers fuses.
7.2 GJ1 DISTRIBUTION, TIERS 2 AND 3, GROUPS A & B
This section describes installation of the GJ1breaker distribution option in Tiers 2 and 3, Groups A & B. Installation of GJ1 circuit
breakers is described in Chapter 8.
Figure 7-7 shows many of the components included in the kit. Figure 7-6 shows GJ1 distribution assemblies in Groups A & B. It also
shows the alarm wiring.
Table 7-1 identifies the groups in which a GJ1 distribution assembly can be installed. A GJ1 assembly must be the topmost
distribution assembly since other distribution types cannot be installed above a GJ1 assembly.
Bus Bars
Tier 1
Group A
Tier 1
Group B
Tier 2
Group A
Tier 2
Group B
Distribution
Assemblies
Fuse Alarm
(FA) Wire
L
ef
t
Re
ar
C
or
ne
r
of
Rac
k
Le
ft
F
ro
nt
C
or
ne
r
of
R
ac
k
Distribution Assemblies
Tier 3, Grp A
Tier 3, Grp B
Fuse Alarm
(FA) Wire
FIGURE 7-6 DISTRIBUTION ASSEMBLIES, GJ1