7.0 DISTRIBUTION OPTION KIT INSTALLATION
Distribution options included on the initial Power system order are factory installed. To field install a distribution option, follow the
appropriate section in this chapter.
While it is recommended that the Power system be powered down before installing a distribution option, an option can be installed in
a live Power system when proper safeguards are observed.
WARNING
Arcing hazard
Arcing can cause equipment damage, load interruptions, and personal injury.
Remove watch and jewelry. Use insulated tools and extreme caution when working on a
live Power system or on a battery string.
Insulate the free ends of any un-terminated cables.
There are 6 distribution groups organized in three Tiers with two Groups in each Tier: All are located in the Power system’s
distribution area, as shown in Figure 7-1. The type of distribution that can be installed in each group is discussed below and listed in
Table 7-1. Tier 2 & Tier 3 can be field installed. Figures 7-2 and 7-3 show typical left and right side views of the distribution area.
FIGURE 7-1 DISTRIBUTION LOCATION BY TIER AND GROUP
LEFT SIDE
DISTRIBUTION
GROUPS A & B
ON EACH TIER