Sageon III Power System
Installation
PM990-8800-00, Rev. 9
2-13
1.
Select a starting point, Tier 1, Group A Position 1 is recommended. Use appropriate lugs on the load supply and return
cables.
2.
Dress the cable as shown in Figure 2-9, toward the front or rear of the rack according to the orientation of the distribution
assembly. Dress the cable away from rack assembly hardware to avoid possible chafing of the cable insulation.
Detail of Load Supply Cable Connection
FIGURE 2-10 AM1 TYPE DISTRIBUTION LUGGING
3.
Move to Group A, Position 2 and repeat the above steps. Repeat the steps until all positions in Tier 1, Group A are cabled.
4.
Move to Tier 1, Group B, and cable the positions.
5.
Perform the above steps for Tiers 2 and 3.
6.
Bundle and secure cables as follows. Two cable-securing tabs are provided in each distribution assembly mounting bracket.
See Figures 2-10 and 7-2 for cable securing locations
1)
All Group A – Bundle cabling from all tiers at the left front of the rack.
2)
All Group B – Bundle cabling from all tiers at the left rear of the rack.
Battery Discharge Bus Bar
Alarm Strip
Circuit Breaker or Fuse –
Note orientation:
Short Mounting Surface
Long Mounting Surface
(Output Terminal)
Distribution Assembly
Mounting Bracket
Paired Output Studs
Load Supply Cable,
See Detail Below
Alarm Connection
Bus Bar
1/4-20 Nuts
Load Supply Cable and
2-Hole Lug
Circuit Breaker or Fuse –
Note mounting surface
orientation.
Holes for
Securing Cable