5 Transport, setup and acceptance
NOTE
Generally, the process gas analyser is started up by UNION Instruments GmbH or
service technicians.
If it is not transported, set up and started up by Union Instruments GmbH (for
example in-house transportation and resale), coordinate the appropriate
procedure with UNION Instruments GmbH (
Chapter 12 Service).
5.1 Transport
WARNING
Possible injury from the process gas analyser tipping over or falling from pallets
and load carrying equipment.
•
At least two persons are required to unpack and transport the analyser (for
weight see technical data)!
•
Check the load bearing capacity and condition of the slinging equipment and
carefully attach it.
•
Never stand under suspended loads.
NOTE
In case of damage during transport from improper handling, the carrier should
perform a damage report within seven days (railway, post office, freight
forwarder).
Summary of Contents for INCA1011
Page 3: ...3 Dimensions ...
Page 10: ...EU Declaration of Conformity 10 ...
Page 16: ...Safety equipment 16 3 2 Markings and warnings Fig 3 1 Markings and warnings 1 Type plate 1 ...
Page 44: ...Operation 44 ...
Page 46: ...Decommissioning switching off 46 ...
Page 50: ...Maintenance 50 ...
Page 54: ...Service 54 ...
Page 56: ...Associated documents 56 ...
Page 58: ...Disposal 58 ...
Page 60: ...Spare parts 60 ...
Page 61: ...61 16 Annex ...
Page 62: ...Annex 62 EU Declaration of Conformity Flame arrester ...
Page 63: ...Annex 63 ...