![Union Instruments PMS3000 Translation Of The Original Operating Instructions Download Page 52](http://html.mh-extra.com/html/union-instruments/pms3000/pms3000_translation-of-the-original-operating-instructions_843056052.webp)
Maintenance
52
Jul-2020
10.4 Maintenance/inspection
DVGW rules and regulations require routine
calibration.
The PMS3000 displays a notice as soon as the calibration has expired. The notice
must be confirmed with the Next button; the PMS3000 remains operational.
A reminder is displayed six weeks
prior to expiration of the calibration
interval.
The reminder is repeated prior to
the start of every test sequence.
NOTE
Calibration date – The calibration date is listed in the test log!
Summary of Contents for PMS3000
Page 1: ...Jul 2020 V1 06 Translation of the original operating instructions Pressure Test Kit PMS3000 ...
Page 10: ...10 Jul 2020 ...
Page 11: ...Jul 2020 11 1 EU Declaration of Conformity ...
Page 12: ...EU Declaration of Conformity 12 Jul 2020 ...
Page 18: ...Safety instructions 18 Jul 2020 ...
Page 19: ...Jul 2020 19 3 Label Fig 3 1 Designation Name plate 1 Name plate 1 ...
Page 20: ...Label 20 Jul 2020 ...
Page 28: ...Transport setup and acceptance 28 Jul 2020 ...
Page 32: ...Description of the interfaces operator control elements 32 Jul 2020 ...
Page 48: ...Operation 48 Jul 2020 ...
Page 50: ...Decommissioning turning off 50 Jul 2020 ...
Page 56: ...Service 56 Jul 2020 ...
Page 58: ...Related documents 58 Jul 2020 ...
Page 60: ...Disposal 60 Jul 2020 ...
Page 62: ...Spare parts 62 Jul 2020 ...
Page 65: ...Jul 2020 65 ...
Page 66: ...Appendix 66 ...
Page 67: ...Jul 2020 67 ...