
Connections
18
Fig. 4.2:
Connections
1. Output process gas
7. Input process gas 3
2. Input calibration gas 1
8. Input process gas 4
3. Input process gas 1
9. Input calibration gas 1
4. Input process gas 2
10. Output condensate
5. Lead-throughs for power supply
11. Output pressure regulator leakage
6. Input ambient air
12. Input compressed air
The compressed air must be dry and free of dust; otherwise, the valves can be
destroyed.
Control pressure: 6 - 8 bar (87 - 115 psi). Every 15 minutes, 50l of compressed air
is required for 60 seconds.
4.1 Accessories
WARNING
Risk of injury/defective!
Use of non-approved accessories can cause defects and be hazardous. This will
render the warranty null and void. The operator is then liable for any damage that
may occur.
Only use original accessories or accessories that have been approved by Union
Instruments GmbH.
5
1
6
7
8
12
10
9
11
2
3
4
Summary of Contents for INCA6001
Page 3: ...3 Dimensions ...
Page 10: ...EU Declaration of Conformity 10 ...
Page 30: ...Transport setup and acceptance 30 ...
Page 32: ...Startup switching on 32 ...
Page 46: ...Operation 46 ...
Page 48: ...Decommissioning switching off 48 ...
Page 52: ...Maintenance 52 ...
Page 56: ...Service 56 ...
Page 58: ...Associated documents 58 ...
Page 60: ...Disposal 60 ...
Page 62: ...Spare parts 62 ...
Page 63: ...63 16 Annex ...
Page 64: ...Annex 64 EU Declaration of Conformity Flame arrester ...
Page 65: ...Annex 65 ...