UNION Instruments GmbH
INCA Analyzer Series
– Instruction Manual
Page 2 of 59
PLEASE READ THIS BEFORE PROCEEDING!
PLEASE
READ
THIS
BEFORE
PROCEEDING!
Read all instructions prior to installing, operating and servicing the instrument.
Follow all important notes and cautions marked on and supplied with the instrument.
If you do not understand any of the instructions contact your Union Instruments
GmbH representative for clarification.
Install your equipment as specified in the installation instructions with appropriate
local and national codes. Connect all products to the proper electrical and pressure
sources.
Use only qualified personnel to install, operate, software update and maintaining the
instrument to ensure proper performance.
When replacement parts are required ensure that you use only spare parts specified
by Union Instruments GmbH. Unauthorized parts and procedures can affect the
instrument‟s performance, place the operation of your process at risk and VOID
YOUR WARRANTY. Look-alike substitutions may result in fire, electrical/chemical
hazards or improper operation.
Equipment door should be closed except when maintenance is being performed by
qualified personnel to prevent electrical shock and personal injury.
The features of the instrument and the information in this document are subject to change
without notice.
For technical or other questions, please contact:
UNION Instruments GmbH
Zeppelinstr. 42
76185 Karlsruhe
Germany
+49 (0)721-95243-0
+49 (0)721-95243-33
http://www.union-instruments.com