UNION Instruments GmbH
INCA Analyzer Series
– Instruction Manual
Calibration
Page 37 of 59
5.1.4
Automatic calibration
The analyzer is pre-programmed doing automatic calibration after every purge gas
phase.
Depending on the setup of the analyzer (continuous or discontinuous measurement), a purge
gas phase is run through from every 15 minutes up to 12 hours between the calibration
phases. For automatic calibration, the calibration gas must be permanently connected to the
analyzer. Automatic purge gas calibration is performed at the end of the purge gas phase.
It is possible to configure the interval of the automatic calibration using INCACtrl software.
(Tab:
Calibration
CALIBRATION INTERVAL
)
Figure 5-10: Calibration intervals