Chapter 2 Installation and Wiring
6
Chapter 2 Installation and Wiring
2.1 Out-of-Box Inspection
Check whether the packages are damaged. If the packages are intact, check the
main components against the shipping list. If any inconsistency is found, contact us in
time.
The main components include cabinets, signal cable, power cable, USB cable,
DVI cable, and sending box. For details about the components, refer to the shipping
list.
2.2 General Installation
Screen calibration is performed on the UHWII series product before shipment,
and the product needs to be installed sequentially according to the cabinet number, as
shown in Figure 2-1:
Fig 2-1 Rear View of the Display
Summary of Contents for UHWII Series