MXVOLTA BATTERY   
TECHNICAL &   
HANDLING 
MANUAL

 

 
 
 
 
 

 
 
 
 
 
 
 
 

Summary of Contents for MXVOLTA

Page 1: ...UNIKOR BATTERY CO LTD www ukbkorea com MXVOLTA BATTERY TECHNICAL HANDLING MANUAL...

Page 2: ...EFORE USING 3 1 Unloading and checking 3 2 Installation and connection 3 3 Operational test and recharge 4 DAILY INSPECTION AND SERVICING 4 1 Treatment 4 2 Discharge 4 3 Charge A MONTHLY CHEKING B 6MO...

Page 3: ...y and will not get any bad influence in spite of using a long period of time As it is no need to add pure water for MXVOLTA battery because we made MXVOLTA battery minimized to generate gas such as H2...

Page 4: ...e pole when charging it and this is due to less excessive voltage by generation of hydrogen on alloy plate of lead and antimony When charging VRLA battery the over voltage of hydrogen generating was l...

Page 5: ...nt but b is removable but a that is to say the electrolyte itself cannot be eliminated and so the electric discharge phenomenon by lead battery cannot completely be restrained However electric dischar...

Page 6: ...as batteries furnished with charged status Recommended torque for connecting bolts and nuts are Size of Bolt Nut Torque M6 Bolt 11 1 N m M8 Bolt 20 2 N m M10 Bolt 30 3 N m M10 Nut 18 2 N m c After co...

Page 7: ...w current discharge of 20 hours case Increasing voltage causes shorten time duration of discharge as Figure I shows Note C means nominal capacity with 20 hours rate Figure shows 6 Volt battery Figure...

Page 8: ...eds during charging of initial current to the middle current electric current redcoats rapidly because being charge constant voltage at the last period of charging At the last period of charging keeps...

Page 9: ...ent charge initially is with current remitted to 0 4C As it is hardly possible to check the tine charged full we recommended using a timer to be automatically stopped or the charger to be changed to f...

Page 10: ...cases take mending or change B 6MONTHLY CHECKING Checking point Description Standard Arrangement Battery room subsidiary facilities a State of vent valve b Safety facilities like fire extinguisher c...

Page 11: ...ber and fasten battery firmly when heavy vibration of shock is expected during service When connecting the batteries free air space must be provided for each battery The recommended minimum space betw...

Page 12: ...ay 1 month 1 month 2 month 2 month 3 month 3 month 4 month 4 month 5 month 5 month 6 month 2 12 2 11 V 2 11 2 10 V 2 11 2 10 V 2 10 2 09 V 2 10 2 09 V 2 09 2 08 V 12 90 V 12 85 V 12 80 V 12 70 V 12 65...

Page 13: ...0 97 0 97 0 98 0 99 0 99 0 100 0 10 h 96 0 97 0 97 5 97 5 100 0 100 0 100 0 20 h 97 0 98 0 98 0 98 0 50 3 h 62 5 75 0 82 0 85 0 62 5 75 0 87 5 90 0 6 h 75 0 89 0 90 0 92 0 75 0 93 0 96 0 97 0 10 h 90...

Page 14: ...istance No leakage at 2 5psi Vent plug provided with builtin Ceramic filter Prevents ignition entering battery Prevents acid fumes from escaping from the battery Absorptive glass mat with heat oxidati...

Page 15: ...oys dual complete seal construction of O ring and sealing of epoxy resin Synthetic rubber Epoxy resin with acid resistance and high adhesion strength SUS 304 material with acid resistance Cable wire o...

Page 16: ...48000C 45 60 x 0 8026000 0 6019 x 100 60 1950 30 MIN 1 0000000 C 30 60 x 1 0000000 0 5 x 100 50 0000 20 MIN 1 2410000 C 20 60 x 1 2410000 0 413667 x 100 1 3667 10 MIN 1 6180000 C 10 60 x 1 6180000 0 2...