PART I: INSTALLATION
15
GAS TRAIN INSTALLATION DIAGRAMS
In Fig. 26a, Fig. 26b and Fig. 26c are shown the diagrams with the gas train components wich are included in the delivery and
those wich must be fitted by the customer. The diagrams complies with regulations in force.
Burner equipped with 2 gas val-
ves, governor with filter and pres-
sure switch.
Fig. 26a
Burner equipped with DUNGS
MBDLE valves group (2
go pressure
switch).
Fig. 26b
Burner equipped with 2 gas val-
ves, one of which is equipped with
pressure governor, gas filter and
pressure switch.
Fig. 26c
Key
1 Burner
2 Gas valve EV2
3 Gas valve EV1
4 Minimum gas pressure switch
5 Governor with filter
6 Manually operated shut-off valve
7 Bellow joint
8 Leakage control (optional if output is greater than 1200 kW)
9 Multibloc gas valves group
10 Gas valve EV2 with governor
11 Gas filter
1
2
8
3
5
7
6
4
MANUFACTURER CUSTOMER
7
6
1
9
8
7
6
1
10
8
3
4
11
Summary of Contents for P20
Page 30: ...PART II OPERATION 30 Electrical diagram code 18 020 Burners P45 C TN C AB C PR ...
Page 32: ...PART II OPERATION 32 Electrical diagram code 04 622 Burners P20 P30 C MD ...
Page 33: ...PART II OPERATION 33 Electrical diagram 04 642 Burners P45 C MD ...
Page 34: ...PART II OPERATION 34 Electrical diagram code 05 615 Burner P65 C MD ...
Page 35: ...PART II OPERATION 35 SPARE PARTS ...
Page 36: ...PART II OPERATION 36 SPARE PARTS Burners P20 P30 C TN C AB ...
Page 38: ...PART II OPERATION 38 SPARE PARTS Burners P45 C TN C AB P50 C TN P65 C AB ...
Page 40: ...PART II OPERATION 40 SPARE PARTS Burners P20 P30 C MD ...
Page 42: ...PART II OPERATION 42 SPARE PARTS Burners P45 P65 C MD ...
Page 52: ......