E
K
Z
T
-S
R
I
S
EKZT 5-2
Operating Instructions
Electric Chain Hoist
EKZT 5-1, EKZT 5-2
EKZT 10-1, EKZT 10-2
EKZT 20-1, EKZT 20-2
Page 1: ...EKZT S ERIES EKZT 5 2 Operating Instructions Electric Chain Hoist EKZT 5 1 EKZT 5 2 EKZT 10 1 EKZT 10 2 EKZT 20 1 EKZT 20 2...
Page 2: ...Safety 3 2 1 Symbol explanation 3 2 2 Obligations of the operating company 4 2 3 Requirements to staff 5 2 4 Personal protective equipment 5 2 5 General safety regulations 6 2 6 Safety information for...
Page 3: ...nce and knowledge gained from using the application which then could be shared and be valuable to develop our products even further 1 3 Limitation of liability All information and notes in these opera...
Page 4: ...r correspond to the current status of the regulations and must adapt these if necessary The operating company must unambiguously reg ulate and determine the responsibilities for instal lation operatio...
Page 5: ...ur cus tomer service for the execution of all arising work 2 4 Personal protective equipment The personal protective equipment serves to protect per sons against impairments of safety and health while...
Page 6: ...tenance or repair is complete 2 7 Safety marking on the electric chain hoist The following safety marking is attached to the electric chain hoist fig 1 which must be observed and follo wed Fig 1 Safet...
Page 7: ...ich prevent any accidents or damage caused by these re si dual risks Risk of crushing of upper and lower limbs while equipment is operating During set up and adjustment works it may be come necessary...
Page 8: ...s should be ta ken to a collection point for recyclable materials or to the local waste disposal company 5 3 Storage Oil the electric chain hoist and store it in a frost free and dry environment Do no...
Page 9: ...arrow clockwise 2 Key ON Kettenzug einschalten 3 Position OPEN Lift the load upwards 4 Position AB Lift the load upwards 5 Position LEFT Move landing gear to the left 6 Position RIGHT Move landing ge...
Page 10: ...always be suspended from suitable equipment which has sufficient load bear ing capacity to withstand the weight of the load and the chain hoist If the load bearing capacity is exceeded the chain hoist...
Page 11: ...that the safety of the hook is closed Step 2 Press the button OPEN and initially drive only until the load chain is tensioned Step 3 First lift the load only a short distance and check that the chain...
Page 12: ...to the actual signs of wear If you have questions about maintenance work and intervals contact the manufactu rer The contact details can be found in chapter 1 2 Cu stomer Service If the electric chai...
Page 13: ...ing the chain check the chain guide and re place if necessary main tenance intervall maintenance work before every use Check the chain hoist for damage and wear especially the chain links for bending...
Page 14: ...severe condi tions e g frequent operation with full load dusty or ag gressive environment high switching frequency high switch on duration the test distances must be shorte ned Experts for the inspec...
Page 15: ...cause Solution Chain hoist motor is not functioning 1 Inadequate power supply 2 Wrong phase conductor 3 Switch defective 4 Rectifier defective 5 Transformer defective 6 Motor defective 1 Check power...
Page 16: ...and year of construction on the type plate which is fi xed on the compressor Example The support hook for the EKZT 5 1 must be ordered The carrying hook has the position number 26 in the spare part dr...
Page 17: ...2 Spare parts drawing In case of service the following drawing shall help to identify the necessary spare parts If necessary send a copy of the parts drawing with the marked components to your author...
Page 18: ...al wiring diagram 13 Electrical wiring diagram EKZT 5 1 EKZT 10 1 EKZT 20 1 Fig 9 Electrical wiring diagram EKZT Models with a lifting speed EKZT 5 2 EKZT 10 2 EKZT 20 2 Fig 10 Electrical wiring diagr...
Page 19: ...es with all relevant provisions of the above mentioned directive as well as the other applied directives below including their applicable modifications at the time of the declaration Relevant EU direc...
Page 20: ...40 h 200 h when nee ded 200 h when nee ded yearl y bearings gears lubricate unction check braking system Cleaning brake disc Check for wear brake disc Replacement brake disc Measurement of wear Chain...
Page 21: ...when nee ded 200 h when nee ded yearl y bearings gears lubricate function check braking system Cleaning brake disc Check for wear brake disc Replacement brake disc Measurement of wear Chain hook Repl...
Page 22: ...www unicraft de...