15.2 Flow of oil,when raising
Piston
Rod
Apply"Lock Tight "638"here
Pressure oil
Tunk
Check Valve
opens.
Hezagon socket head screw
For piston turn stop
Hezagon socket head screw
for gland‑bush turn stop
(15−2)
Counter‑Balance Valve
Check Valve opens.
Spool opens
Apply"Lock tight #2701" With"Curing accelerator
#7649"If the addelerater is not used,
do not flow of the agent.After the screw is
tightened,hit with a pinch at 2 places on
its circumference.
Apply"Lock tight #2701" With"Curing accelerator
#7649"If the addelerater is not used,
do not flow of the agent.After the screw is
tightened,hit with a pinch at 2 places on
its circumference.
Summary of Contents for URW295CR
Page 1: ...MAINTENANCE MANUAL FURUKAWA UNIC CORPORATION URW295CR ...
Page 36: ... 9 5 9 5 Back pressure valve O ring 731191018 Back pressure valve Gauge port ...
Page 94: ... QQO VQR KP FGVCKN ...
Page 100: ... 9 4 412 4 6 0 0 0 5 KOKV UYKVEJ ...
Page 124: ... 㧟㧞 ...
Page 125: ... ...