(9−1)
(9−2)
3 Relief valve for storing hook
(9−3)
(9−4)
(9−5)
(9−6)
(9−7)
(9−8)
9 O-ring fitted on jointing surface of valve body
(9−9)
(9−10)
11 Spool assembly (types of D, H, T, S)
(9−11)
10. Oil flow in the in-out body
1 When no operation is carried out
(10−1)
2 When crane is being operated
(10−2)
(10−3)
(10−4)
(10−5)
(10−6)
(10−7)
8 Description of acceleration cylinder function
(10−8)
(11−1)
2 Hydraulic Circuit Diagram(control valve)
(11−2)
(11−3)
1 Piping of control valve for running
(12−1)
2 Control valve piping for crane
(12−2)
3 Outoriga change valve piping
(12−3)
4 Construction of swivel joint and position of houses
(12−4〜5)
(12−6)
(1) Simultaneous telescoping of boom4 and boom5
(13−1)
(2) Boom 4, 5 front side section in detail
(13−2)
(3) Boom 3, 4 rear side section in detail
(13−3)
(4) Installation procedures for slide plate and guide
(13−4)
4 When hook is being wound up by hook storing operation
5 When hook storing relief valve is being functioned by hook storing operation
6 When boom up, hook up,boom retraction, and slewing C.W. are functioning
7 When boom down, hook down, boom ext, and slewing C.C.W. are functioning
Summary of Contents for URW295CR
Page 1: ...MAINTENANCE MANUAL FURUKAWA UNIC CORPORATION URW295CR ...
Page 36: ... 9 5 9 5 Back pressure valve O ring 731191018 Back pressure valve Gauge port ...
Page 94: ... QQO VQR KP FGVCKN ...
Page 100: ... 9 4 412 4 6 0 0 0 5 KOKV UYKVEJ ...
Page 124: ... 㧟㧞 ...
Page 125: ... ...