
Pick
Smarter.
Pick
Better.
Pick
UNEX.
ASSEMBLY INSTRUCTIONS
A Flow Cell modular unit starts with a framework of vertical Posts & horizontal Beams
(Flow Cell Structure)
bolted together with 3/8"-16 hardware (included)—only one wrench size (9/16") is required.
This base structure plus
Span-Track carton flow track
and any of several optional features
complete the Flow Cell assembly.
Attach side Beams (2) to Posts (2) for each side of cell — one high, one low.
FlowCell with Tool Bar will have 2 longer posts at front. Note: Ensure foot
plates oriented in the same direction. If using rigid casters, align long
dimension of plates in direction cell is to roll.
1
Join the 2 sides by bolting on front
beams at discharge heights at front of
cell. For return lane front beam would
be at load height.
2
Bolt on rear beams for each level
approximately 1" higher per foot than
front beams. Recommended pitch is 1
inch for every 1 foot of rack depth.
3
Slip plastic End Caps onto posts.
4
UNEX MANUFACTURING, INC. www.unex.com/resources/video-library
50 Progress Place, Jackson, NJ 08527
800.695.SPAN (7726)
732-928-2800 • fax: 732-928-2828 • e-mail: [email protected] • unex.com
FLOW CELL STRUCTURE
FLOW CELL OPTIONS
(all necessary brackets and hardware are included)
(video instruction hyperlinks below in text)
NOTE:
Before
attaching side Beams,
determine front &
rear Beam positions
(be sure to consider
pitch), since side
Beams cannot share
Post locations with
front & rear Beams.
CASTERS
Attach casters to
foot plates using
3/8" bolts. (provided)
http://www.youtube.com/watch?v=FmfHPMQroU4
WORKBENCH
Attach shelf brackets (2) to posts at desired height
using 3/8 bolts. Attach workbench, inserting 4
bolts from below.
http://www.youtube.com/watch?v=sJKyUwg0SmU
ADD-ON TRAY
Attach tray brackets to tray. Hang back of tray
over front beam. Bolt brackets to posts. Attach
full-length Label Holder to front surface of
Add-On Tray using two-sided tape (provided
on back side of Label Holder).
For detailed video installation instructions, please go to: www.unex.com/resources/video-library
OVERHEAD TOOL BAR
Attach brackets (2) at top of front posts using 3/8"
bolts. Attach tool bar strut channel with 2 bolts
inserted from below, and 2 strut nuts.
http://www.youtube.com/watch?v=6fNYzAxCfww